This document has been developed from the Phase 1 document number, Project1-FEED CONTRACTOR-FACILITY-0000-PR-LST-0001 Rev 006, incorporating SAP coding requirements and technical updates.
PROJECT1 DEVELOPMENT PROJECT
EQUIPMENT LIST
002
Approved for Design
LY"
CF
DATE
001
Issued for Approval
JG
JL
CF
DATE
000
Issued for Review
JG
JL
CF
DATE
A01
Inter-discipline check
JG
JL
DATE
REV
DESCRIPTION
ORIG
CK'D
APP'D
DATE
ORIGINAL DRAWING SIZE: A3
SCALE: NONE
EQUIPMENT LIST
CLIENT : COMPANY
ELECTRONIC FILE: Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Project1-FEED CONTRACTOR--MUL-E000- PR-LST-0001 SH. 1 of 35
PROJECT1 DEVELOPMENT PROJECT EQUIPMENT LIST
Page 1 of 35 Project1-FEED CONTRACTOR-MUL-E000-PR-LST-0001 Rev 002
Rev.
002
EQUIPMENT LIST DETAILS
GENERAL
NOTES & HOLDS
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
NOTES & HOLDS
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001
Date
DATE
General Notes:
1 - Pages have been ordered as per System Code.
2 - Notes specific to equipment are listed in their relevant sheets.
3 - Capacity of FACILITY is 2.8 MSCMD (i.e. 2.0 MSCMD gas sales volume plus 10% shrinkage for LPG recovery at Location O plus 20% swing factor (DCQ) plus 0.1 MSCMD allowance for fuel gas).
4 - Operating conditions taken from Heat and Material balances:
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-CAL-0001 Heat and Material Balance: Lean Summer
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-CAL-0002 Heat and Material Balance: 30% Lean, 70% Rich Summer PROJECT1-FEED CONTRACTOR-PF01-E000-PR-CAL-0003 Heat and Material Balance: Lean Winter
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-CAL-0004 Heat and Material Balance: 30% Lean, 70% Rich Winter
5 - Aquifer water will be supplied to the FACILITY from a local aquifer well drilled at Project1. A back-up aquifer water supply will be available from the Tieret Well via a pipeline. (HOLD 2)
6 - All skids and packages will be manufactured with a requirement of easy accessibility for operation and maintenance with minimal screwed fittings. This shall be reviewed further in EPC.
7 - For more details for sizing basis of some equipment, refer to the relevant technical note: PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0001 Technical Note - FACILITY Turndown Requirements
PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0002 Technical Note - Design Pressure For Mobile Units at Wellhead
PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0003 Technical Note - Gas Treating Temperature
PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0004 Technical Note - Equipment required for Liquid Removal from Gas
PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0005 Technical Note - Purge Gas For Flare Header PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0006 Technical Note - Produced Water Disposal PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0007 Technical Note - Mercury Removal Unit Location PROJECT1-FEED CONTRACTOR-FLO-0000-PR-TNO-0001 Technical Note - Hydrate Inhibition
PROJECT1-FEED CONTRACTOR-MUL-0000-PR-TNO-0001 Technical Note - Flowline Pressure Protection
8 - The basis for material selection is discussed in the following correspondences:
PEL(UK)-RFI-000094 date 20/07/2012 COMPANY-MEMO-000645 date 24/07/2012
9 - The following information are preliminary in the absence of vendor data: Weights, Vendor Package Skid Dimensions, Installed Power for pumps and compressor motors, Column / Vessel Internals, Number of Air Coolers and Heat Exchanger Shells.
10 - The changes in Rev 002 of the Equipment List are based on Design and Cost Improvement Report (PROJECT1-FEED CONTRACTOR-MUL-E000-MD-REP-0004) and subsequently issued Design Change Notices (DCNs).
Holds:
1 - Blowdown Study to confirm the minimum design temperatures of equipment (EPC).
2 - Aquifer water source and associated equipment (e.g. wells, pipelines) (EPC).
3 - To be confirmed (EPC).
4 - Package information to be confirmed by Supplier (EPC).
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 2 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 110 GAS WELLS
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
GAS WELLS
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
110-PNL-0101 TO
0108
Wellhead Solar Power System
8
Notes 2, 6
1.0
10 x 4 x 3
1.5
Vendor Standard
110-XR-0109 TO
0116
Chemical Injection Package
8
Note 2
0.12m3/day NOTE5
0.25
383
82
-5 / 85
50
3.0 x 2.0 x 2.5
4 each
316L SS
API 675
For Corrosion Inhibitor
110-V-0117
Mobile Test Separator
1
Notes 1, 4
Gas: 0.425 MSCMD Condensate: 3300 SBPD Water: 1100 SBPD
94
82
-25 / 85
50
5.7 x 2.3 x 2.5
15
CS with 316L clad & 316 internals
ASME VIII Div 1
Yes
Packaged item on rental basis.
110-F-0118
Sand Filter
1
Note 1
383
280
-25 / 85
50
1.0 x 1.0 x 3.0
3.0
CS with 316L clad & 316 internals
150 micron mesh.
110-HP-0119 TO
0126
Wellhead Control Panel
8
Note 2
3.0 x 2.0 x 2.0
3.0
Vendor Standard
API 554
Includes Hydraulic Well Control Panel (HWCU)
110-WHG-0151 TO
0158
Wellheads
8
PROJECT1-FEED CONTRACTOR-OF01-E000-PR-PFD-0011
Not in Contractor's Scope.
NOTE:
• One mobile skid mounted Mobile Test Separator and Sand Filter on rental basis common for all wells (Technical Note - Design Pressure For Mobile Units at Wellhead; PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0002).
• Well site Solar Panels, Chemical Injection Package, Hydraulic Well Control Unit (HWCU) are required per well.
• Deleted.
• Wellhead Mobile Test Separator package includes Test Separator, Ground Flare and Ignitor Package, Choke Manifold and Transfer Pump.
• Corrosion / Scale Inhibitor injection rates to be confirmed during EPC Phase.
• Wellhead electrical load shall be optimised in order to reduce the power consumption and reduce the size of the Solar Panel during the EPC Phase.
• Equipment Tag 110-PK-0127 (Wellhead Water-bath Heater) has been deleted in Rev 002 of this document.
002
002
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 3 of 35
EQUIPMENT LIST DETAILS
SYSTEM CODE: 200
CONDENSATE STABILISATION
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
CONDENSATE STABILISATION
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
200-HE-1401
Pre-Heater
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0002
Shell & Tube
1092 (Note 1)
40
Tube: 25 Shell: 10
Tube: 19.6 Shell: 5.3
Tube: -25 / 210 Shell: -25 / 210
Tube: In= 20 Out= 50 Shell: In= 125, Out= 79.2
0.6 ID x 6.5 T/T
3.6
Shell: CS • 3mm CA Tubes: 316L SS Note 2, 3
TEMA R ASME VIII DIV 1
Yes
200-V-1402
Water / Condensate Separator
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0002
Three Phase Horizontal Separator
25
19.1
-25 / 85
50
2.3 ID x 5.7 T/T
18.0
CS • 3mm CA with Internal Lining and 316L SS Internals Note 5
ASME VIII Div 1
Yes
Plate pack internals. Weight does not include internals.
200-HE-1403
Condensate/ Condensate Heat Exchanger
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0002
Shell & Tube
1340 (Note 1)
54
Tube: 25 Shell: 10
Tube: 18.8 Shell: 6.5
Tube: -25 / 210 Shell: -25 / 210
Tube: In= 50 Out= 114 Shell: In= 177, Out= 125
0.65 ID x 6.5 T/T
4.0
Shell: CS • 3mm CA Tubes: 316L SS Note 2, 3
TEMA R ASME VIII DIV 1
Yes
Maximum duty and maximum temperature are not necessarily coincident.
200-C-1404
Condensate Stabilisation Column
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0002
Packing
10
6.5
-5 / 210
177
1.1 ID x 13.3 T/T Note 4
7.5
CS with 316L SS Clad and 316L SS Internals Note 3
ASME VIII Div 1
Yes
Yes
Weight does not include internals.
200-V-1405
Water Draw Off Vessel
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0002
Vertical
10
6.4
-5 / 210
95
0.8 ID x 2.0 T/T
1.3
CS • 3mmCA with Internal Lining and 316L SS Internals Note 5
ASME VIII Div 1
Yes
Yes
200-HE-1406
Condensate Reboiler
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0002
Kettle Type
2791 (Note 1)
170
Tube: FV / 15 Shell: FV / 10
6.5
Tube: -5 / 235 Shell: -5 / 210
Tube: 220 Shell: 177
0.9 / 2.0 ID x 7.5 L
8.0
Shell: CS•316L SS Clad Tube Side: CS
• 3mm CA Tubes: 316L SS
TEMA R ASME VIII DIV 1
Yes
Maximum duty and maximum temperature are not necessarily coincident.
200-CLR-1407
Condensate Run Down Cooler
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0002
Air Cooler
1255 (Note 1)
44
178 (Bare
Tube)
10
4.8
-5 / 135
In: 115 Out: 60
3.7 ID x 7.3 L
13.5
Heads: CS • 3mm CA Tubes: CS • Al Fins
API 661 ASME VIII DIV 1
1 bay - 2 fans per bay. Total Fan duty = 27 kW
NOTE:
• This has been pro-rated from the Rich Winter Heat and Material Balance to correspond to 7,000 SBPD condensate product from FACILITY.
• Tube sheet / channel materials: CS • 316L SS Clad
• Solid CRA may be selected instead of CS Clad where cost / fabrication benefits exist.
• Condensate stabilisation column dimensions are based on structured packing internals.
• CS • 316L SS Clad is alternate material to internal lining.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 4 of 35
EQUIPMENT LIST DETAILS
SYSTEM CODE: 210
TEST SEPARATION AND METERING
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
TEST SEPARATION AND METERING
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
210-V-0301
Test Separator
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0001
Three Phase Vertical vessel
Gas: 0.425 MSCMD Condensate: 3283 SBPD Water: 1094 SBPD
FV / 65
54
-25 / 85
50
1.6 x 6.1 (ID x TT)
22.0
CS with 316L SS Clad and 316L SS Internals
ASME VIII Div 1
Yes
The weight of vessel does not include internals. Includes 3m3 slug volume
NOTE:
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 5 of 35
EQUIPMENT LIST DETAILS
SYSTEM CODE: 220
GAS RECEPTION AND SEPARATION
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
GAS RECEPTION AND SEPARATION
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
HP Header Gas : 2.83 MSCMD
HP: 55.3
Skid mounted, 8 slot manifold comprising HP, MP, LP and test production header.
220-XX-0401
Inlet Manifold - HP, MP, LP & Test Header
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-
Liquid: 10355 SBPD
94
MP: 20.0
-25 / 85
50
19 m x 4.5 m
80
LTCS + 4.5 mm CA
ASME B31.3
HP: 16 x 19 m long; MP: 16 x 19 m long; LP: 16 x
002
PFD-0001
(Note 1)
Note 4
LP: 7.0
19 m long; Test: 6 x 19 m long
Test Header
Note 4
0.425 MSCMD
Shell: 160
Tube: FV
Tube:
Shell: CS + 3mm CA
Tube:
Tube: In:
220-HE-0402
Inlet Heater
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-
Shell & Tube
1,903
44
/ 94
54.8
-25 / 235
10°C
0.7 ID x 6.5 T/T
5.0
Tubes: UNS S32750
TEMA R
Yes
PFD-0001
Shell: FV
Shell: -5 /
Tubesheet: UNS S32750
ASME VIII DIV 1
Shell: 10
Out: 25°C
/ 15
235
Channel: UNS S32750
(Note 3)
Gas: 2.83 MSCMD
Condensate: 9309 SBPD
220-V-0403
Inlet Separator
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0001
Three Phase Vertical vessel
(Note 1)
FV / 65
54.3
-25 / 85
50
2.2 ID x 7.3 T/T
42.0
CS with 316L SS Clad and 316L SS Internals
ASME VIII Div 1
Yes
Weight does not include internals. Includes 3 m3 slug volume.
Water: 1046 SBPD
(Note 1)
NOTE:
1. This has been pro-rated from the Rich Winter Heat and Material Balance to correspond to 7,000 SBPD condensate product from FACILITY.
• Inlet manifold will have provision to extend the headers for connection of future wells.
• During summer, the Inlet Heater will be bypassed.
• Skid shall be divided into two units for transportation purposes.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 6 of 35
EQUIPMENT LIST DETAILS
SYSTEM CODE: 232
OFFGAS COMPRESSION
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
OFFGAS COMPRESSION
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
Offgas Compression Train consists of (Note 1,2):
232-VG-1001
1st Stage Offgas Compression Suction Scrubber
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0003
Vertical Vessel
FV / 13
5.4
-25 / 150
74.6
0.8 ID x 1.9 T/T
1.5
CS • 316L SS Clad with 316L SS Internals
ASME VIII DIV 1
Yes
Yes
002
232-K-1002
1st Stage Offgas Compressor
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0003
Reciprocating (Note 3)
6336 Sm3/h
284
800 (Note 3)
25
In: 5.3 Out: 18.5
-25 / 160
In: 74.3 Out: 130
18 (Note 3)
Vendor Specified
API 618
13.2 bar differential. (HOLD 4)
002
232-CLR-1003
1st Stage Offgas Compression Discharge
Cooler
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0003
Air Cooler
1,022
30
178 (Bare Tube)
FV / 25
18.5
-25 / 160
In: 130 Out: 60
3.7 x 7.3
14.0
316L SS tubes • header
API 661 ASME VIII DIV 1
1 bay - 2 fans per bay. Total Fan duty = 22 kW
002
232-VG-1004
2nd Stage Offgas Compression Suction Scrubber
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0003
Vertical Vessel
FV / 40
18
-25 / 115
47.4
1.0 ID x 2.3 T/T
2.0
CS • 316L SS Clad with 316L SS Internals
ASME VIII div 1
Yes
Yes
002
232-K-1005
2nd Stage Offgas Compressor
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0003
Reciprocating (Note 3)
8158 Sm3/h
334
Note 3
65
In: 17.9 Out: 55.4
-25 / 150
In: 47.4 Out: 120
Note 3
Note 3
Vendor Specified
API 618
37.5 bar differential.
002
232-CLR-1006
2nd Stage Offgas Compression Discharge
Cooler
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0003
Air Cooler
605
25
89 (Bare Tube)
FV / 65
54.7
-25 / 150
In: 120 Out: 60
1.8 x 7.3
6.0
316L SS tubes • header
API 661 ASME VIII DIV 1
1 bays - 2 fans per bay. Total Fan duty = 12 kW
002
232-P-1007A/B
Compressor Condensate Recycle Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0003
Positive Displacement
3.4 m3/h @ 15.0 bar diff.
1.8
3.0
25
In: 5.3 Out: 20.6
-25 / 100
74.3
1.0
CS
API 676
002
NOTE:
• Offgas Compressor Train is of 1 x 100% configuration. All equipment for Train B have been deleted in Rev 002 of this document.
• Offgas Compressor may be packaged subject to size i.e. compressor (including gear box and driver) and scrubbers on a baseplate with control panel pre-wired and tested.
• Two stages on a single shaft. Weight and installed power included in first stage. Weight includes baseplate and motor..
002
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 7 of 35
EQUIPMENT LIST DETAILS
SYSTEM CODE: 240
GAS TREATMENT
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
GAS TREATMENT
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
240-FCL-0501
Gas Treatment Filter Coalescer
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0004
Vertical Vessel
2.89 MSCMD
FV /65
54.0
-25 / 85
49.5
0.74 ID x 5.0 T/T (Note 1)
13.7
316L SS with 316L SS internals (Note 2)
ASME VIII Div 1
Yes
Note 4
NOTE:
• Vessel dimensions based on vendor information from Phase 1. To be confirmed with supplier during EPC.
• CS Clad material may be used in lieu of solid CRA material.
• Equipment Tag 240-DR-0502 (Mercury Removal Bed) and 240-FC-0503 (After-Filter for Mercury Removal Unit) have been deferred for procurement until further information regarding mercury content is fully assessed. Accordingly, these items have been deleted in the Rev 002 of this document.
• HAZOP recommendation for a standby Filter Coalescer was not considered and 'Management of Change' to be issued by Company.
002
002
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 8 of 35
EQUIPMENT LIST DETAILS
SYSTEM CODE: 250
GAS CONDITIONING (DEHYDRATION AND DEW POINTING)
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
GAS CONDITIONING (DEHYDRATION AND DEW POINTING)
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
250-HE-0701
Export Gas/ Sweet Gas Heat Exchanger
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0005
Hair Pin
2,024
856 (Note 2)
FV / 65
Tube:
52.0 Shell:
48.7
-46 / 85
Tube: In= 55, Out= 30.0; Shell: In= 20.3, Out= 50
12 x 1.5 x 2.0 (Note 2)
30
Shell: LTCS • 3 mm CA Tubes: 316L SS Tubesheet: 316L SS Channel: 316L SS
ASME VIII Div 1 / TEMA R
Yes
Combine with 250-HE-0706 on one skid.
250-FCL-0703
TEG Contactor Filter Coalescer
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0005
Vertical Vessel
2.86 MSCMD
FV / 65
51.4
-25 / 85
30
1.8 ID x 5.3 T/T (Note 1)
25.0
CS with 316L Clad and 316L SS Internals
ASME VIII Div 1
Yes
Yes
Note 1
002
250-C-0704
TEG Contactor
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0005
Structured Packing (Note 3, 4)
FV / 65
51.1
-25 / 85 (Note 4)
30
1.35 ID x 8.5 T/T (Note 1)
20.0
Lower: CS • 316L SS Clad, Upper: CS • 3mm CA 316L SS Internals
ASME VIII Div 1
Yes
Yes
The weight of column does not include internals
250-PK-0705
TEG Regeneration Package (comprising):
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-PFD-0005
Note 3
10.5 x 2.6 x 4.8
26
Vendor specified
HOLD 4
250-CLR-0709
Lean Glycol Air Cooler
1
Air Cooler (Note 3)
40
11
20 (Bare Tube)
65
52
-5 / 100
In: 86 Out: 60
316L SS Header : Al finned tubes
API RP661 & ASME VIII DIV I
Part of TEG Regeneration Package
1 bay - 2 fans per bay. Total Fan duty = 5 kW
Not installed on skid.
250-CND-0710
Glycol Regeneration Condenser
1
Reflux Coil (Note 3)
4
3.5
0.1
-5 / 135
100
316L SS
API RP661 & ASME VIII DIV I
Yes
Part of TEG Regeneration Package.
250-HE-0711
Lean / Rich Glycol Heat Exchanger
1
Brown fin tube or plate & frame
exchanger
(Note 3)
200
16
10 (shell), 10 (tube)
0.2 (shell), 3.5 (tube)
-5 / 235 (tube), -5 / 235 (shell)
Tube: In:=35
Out = 150 Shell: In= 204
Out = 86
CS • 3 mm CA
ASME VIII DIV I
Yes
Part of TEG Regeneration Package.
250-F-0712A/B
Glycol Particle Filter
2
Cartridges, vertical, polypropylene elements (Note 3)
2,250 kg/h
10
3.5
-5 / 100
35
CS • 3 mm CA
ASME VIII DIV I
Yes
Part of TEG Regeneration Package.
250-F-0713
Glycol Charcoal Filter
1
Charcoal, carbon elements (Note 3)
2,250 kg/h
10
4
-5 / 100
35
CS • 3 mm CA
ASME VIII DIV I
Yes
Part of TEG Regeneration Package.
250-P-0714A/B
Lean Glycol Pump
2
Fixed Stroke Reciprocating (Note 3)
2.0 m3/h
5
7.5
65
53
-5 / 140
86
CS
API STD 674
Yes
Part of TEG Regeneration Package.
250-C-0715
Regeneration Column
1
Random Packing (Note 3)
2,390 kg/h
3.5
0.3
-5 / 235
Bottom: 204 Top: 100.1
316L SS
ASME VIII DIV I
Yes
Part of TEG Regeneration Package.
250-V-0716
Glycol Flash Drum
1
Horizontal three phase separator (Note 3)
10
4.2
-5 / 100
35.7
CS • 3 mm CA
ASME VIII DIV I
Yes
Part of TEG Regeneration Package.
250-V-0717
Glycol Surge Drum
1
Horizontal vessel (Note 3)
3.5
0.3
-5 / 235
204
CS • 3 mm CA
ASME VIII DIV I
Yes
Part of TEG Regeneration Package.
250-HE-0718
Glycol Reboiler
1
Electric Heater in Horizontal
Vessel
(Note 3)
145
180
3.5
0.3
-5 / 235
204
CS • 3 mm CA
ASME VIII DIV I
Yes
Part of TEG Regeneration Package. Additional 20% duty for start up case.
250-HE-0706
Export Gas/ Dry Gas Heat Exchanger
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0006
Hair Pin
1039
283
FV / 65
Tube:
50.3 Shell:
49.2
-46 / 85
Tube: In= 31,
Out= 17.7; Shell: In= 5.7,
Out= 20.3
8.0 x 1.0 x 2.0
17
Shell: LTCS • 3 mm CA Tubes: LTCS Tubesheet: LTCS • 3mm CA Channel: LTCS • 3mm CA
TEMA R ASME VIII DIV 1
Yes
Combine with 250-HE-0701 on one skid.
250-HE-0707
Dry Gas Chiller
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0006
Shell & Tube Exchanger
1071
176
Tube: FV / 65 Shell: FV / 18
Tube:
49.8 Shell: 3.7
-46 / 85
Tube: In= 17.7,
Out= 5.8; Shell: In= 0.0,
Out= 1.5
0.8 ID x 8 T/T
6.5
Shell: LTCS • 3 mm CA Tubes: LTCS Tubesheet: LTCS • 3mm CA Channel: LTCS • 3mm CA
TEMA R ASME VIII DIV 1
Yes
250-V-0708
Cold Separator
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0006
Vertical Vessel
2.8 MSCMD
FV / 65
49.3
-46 / 85
5.8
1.7 ID x 3.2 T/T
15.0
LTCS • 3 mm CA with 316L SS Internals
ASME VIII DIV 1
Yes
Yes
NOTE:
• The TEG Contactor Filter Coalescer (250-FCL-0703) includes a 3-phase knock-out section at the bottom to separate water / amine and condensate streams from the cooled gas. Vessel dimensions to be confirmed with Supplier during EPC. Accordingly, Equipment Tag 250-KO-0702 (Sweet Gas KO Drum) has been deleted in Rev. 002 of this document.
• Exchanger type, area and dimensions (pro-rated for revised duty) are based on vendor information from phase 1.
• Package equipment and duties are typical. To be confirmed with supplier during EPC.
• TEG Contactor will be supplied by the Regeneration Package supplier. Design temperature to be confirmed with supplier for failure of Lean Glycol Cooler.
002
002
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 9 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 270
GAS EXPORT AND METERING
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
GAS EXPORT AND METERING
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
270-XX-1202
Export Gas Fiscal Metering Package
1
PROJECT1-FEED CONTRACTOR-OF02-E000-PR- PFD-0009
Includes On-line Gas Chromatograph and dew-point analyser
2.7 MSCMD
94
48.3
-25 / 85
50.2
9.0 (L) x 4.0 (W)
20.0
CS (Vendor Specified)
AGA 9
NOTE:
1. Metering package details will be confirmed during EPC Phase.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 10 of 35
EQUIPMENT LIST DETAILS
SYSTEM CODE: 280
GAS SWEETENING (AMINE)
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
GAS SWEETENING (AMINE)
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
280-C-0601
Amine Absorber Column
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0004
Tray (HOLD 3) (Note 1, 2)
1.2 MSCMD
FV / 65
54
-25 / 85 (Note 2)
68.9
1.3 ID x 20 T/T
35
CS with 316L SS Clad and 316L SS Internals
ASME VIII Div 1
Yes
Yes
The weight of column does not include internals.
280-PK-0602
Amine Regeneration Package (comprising):
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0004
Note 1, 3
Two Skids:
1 - 14.0 (L) x 4.0 (W)
2 - 11.5 (L) x 2.5 (W)
35
HOLD 4
280-V-0603
Amine Regeneration Flash Drum
1
(Note 1)
33 m3/h
15.0
9.0
-5 / 85
60
Included in Package Skid
CS with 316L SS Clad
ASME VIII Div 1
Yes
Part of Amine Regeneration Package
280-HE-0604
Amine Regeneration Lean / Rich Exchanger
1
Plate & Frame Type Exchanger (Note 1)
1,020
2,500
15.0
Rich: 9.0 Lean: 3.5
-5 / 150
Rich: 60 -
90 Lean: 110 -
82
Included in Package Skid
316L SS
ASME VIII DIV I
Yes
Yes
Part of Amine Regeneration Package
280-C-0605
Amine Regeneration Stripper Column
1
HOLD 2 (Note 1)
33 m3/h
5.0
1.0
-5 / 150
110
1.3 x 20.0 (ID x TT) (Free Standing)
11
CS with 316L SS Clad
ASME VIII DIV I
Yes
Yes
Part of Amine Regeneration Package
280-CLR-0606
Amine Regeneration Condenser
1
Air Cooler (Note 1)
100
8
30 (Bare Tube)
5.0
0.9
-5 / 150
In: 80 Out: 60
5.0 x 2.4 x 3.9
5
Duplex SS Header, 316 Tubes
API 661 & ASME VIII DIV I
Yes
Yes
Part of Amine Regeneration Package
1 bay - 2 fans per bay. Total Fan duty = 5.5 kW Induced draft type assumed.
280-V-0607
Amine Regeneration Condensate Drum
1
(Note 1)
5.0
0.7
-5 / 150
60
Included in Package Skid
316L SS
ASME VIII DIV I
Part of Amine Regeneration Package
280-P-0608A/B
Amine Regeneration Reflux Pump
2
Positive Displacement (Note 1)
2.0 m3/h
0.8
1.5
5.0
0.8
-5 / 150
60
Included in Package Skid
316L SS
API 676
Part of Amine Regeneration Package
280-P-0609A/B
Amine Regeneration Lean Solution Booster
Pump
2
Centrifugal (Note 1)
33 m3/h
11
15
5.0
3.5
-5 / 150
110
Included in Package Skid
CS / 316L SS Impeller
API 610
Yes
Part of Amine Regeneration Package
280-CLR-0610
Amine Regeneration Lean Solution Cooler
1
Air Cooler (Note 1)
760
22
85 (Bare Tube)
5
3.5
-5 / 150
In: 82 Out: 60
3.0 x 9.0 x 4.0
11
316L SS
API 661 ASME VIII DIV 1
Yes
Part of Amine Regeneration Package
2 bays - 2 fans per bay. Total Fan duty = 13 kW Induced draft type assumed.
280-F-0611A/B
Mechanical Filter
2
(Note 1)
33 m3/h
15.0
9.0
-5 / 85
60
Included in Package Skid
CS
ASME VIII DIV I
Yes
Part of Amine Regeneration Package
280-F-0612A/B
Carbon Filter
2
(Note 1)
6 m3/h
5
3.5
-5 / 150
60
Included in Package Skid
CS
ASME VIII DIV I
Yes
Part of Amine Regeneration Package
280-F-0613A/B
Mechanical Filter
2
(Note 1)
6 m3/h
5
3.5
-5 / 150
60
Included in Package Skid
CS
ASME VIII DIV I
Yes
Part of Amine Regeneration Package
280-P-0614A/B
Amine Regeneration Lean Solution Pump
2
Centrifugal (Note 1)
33 m3/h
65
90
65
56.0
-5 / 85
60
Included in Package Skid
CS / 316L SS Impeller
API 610
Part of Amine Regeneration Package
280-HE-0615
Amine Regeneration Reboiler
1
Shell & tube (kettle) (Note 1)
1,500
160
5.0
1.2
-5 / 150
110
Included in Package Skid
CS + 3mm CA 316L SS Tubes
TEMA R ASME VIII DIV 1
Yes
Part of Amine Regeneration Package. Heating Medium supply to reboiler.
NOTE:
• Package equipment and duties are typical. To be confirmed with supplier during EPC.
• Amine Absorber Column will be supplied by the Amine Regeneration package supplier. Design temperature to be confirmed with supplier for failure of lean amine cooler.
• Automated sampling and analysis of amine solution to be provided utilising mass spectrometry type analytical system.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 11 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 310
CONDENSATE EXPORT LINE
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
CONDENSATE EXPORT LINE
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
310-PLR-1601
Export Condensate Pig Launcher
1
PROJECT1-FEED CONTRACTOR-OF02-E000-PR- PFD-0010
94
Current: 41 Future: 82 (Note 3)
-25 / 85
60
Diameter (Minor/Major Barrel): 6"/10.75" NB Length: 5.8 m
1.00
CS • 3mm CA
ASME B31.4/ ASME VIII Div 1
310-PL-1602
Export Condensate Pipeline
1
PROJECT1-FEED CONTRACTOR-OF02-E000-PR- PFD-0010
10,000 SBPD (Note 1)
94
Current: 41 Future: 82 (Note 3)
-25 / 85
60
11.7 km & 6" NB (7.11 mm thickness)
340
CS API 5L X52• 3 mm CA Externally coated.
ASME B31.4 / NT
109.02
310-PLR-1603
Export Condensate Pig Receiver
1
PROJECT1-FEED CONTRACTOR-OF02-E000-PR- PFD-0010
Note 2
94
72 (Note 3)
-25 / 85
46
Diameter (Minor/Major Barrel): 6"/10.75" NB Length: 8.5m
1.00
CS • 3mm CA
ASME B31.4/ ASME VIII Div 1
310-PIT-1604
Export Condensate Drain Sump
1
Note 2
ATM
ATM
-5 / 85
AMB
1.0 x 1.0 x 1.0
Lined Concrete
310-PNL-1605
PROJECT Z Solar Power System
1
Note 2, 4
0.4
5.0 x 4.0 x 3.0
0.8
Vendor Standard
API 554
NOTE:
• The Export Condensate Pipeline is designed for 10,000 SBPD; the design margin in the capacity enables to bring down the storage inventory after a PROJECT Z shutdown.
• Equipment located near tie-in with PROJECT Z facilities.
• Operating pressure depends on throughput of PROJECT Z pipeline. Currently PROJECT Z is operating a relatively low capacity and export pipeline operating pressure is consequently lower.
• PROJECT Z electrical load shall be optimised in order to reduce the power consumption and reduce the size of the Solar Panel during the EPC Phase.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 12 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 320 GAS EXPORT LINE
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
GAS EXPORT LINE
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
Package Notes
Capacity
Duty kW
Instal. Power
kW
PFD No.(each)
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
320-PLR-1101
Export Gas Pig Launcher
1
PROJECT1-FEED CONTRACTOR-OF02-E000-PR- PFD-0009
94
46.4
-25 / 85
49.4
Diameter (Minor/Major Barrel): 24' /30' NB Length: 7.2m
2.70
CS + 3mm CA
ASME B31.8/ ASME VIII Div 1
320-PL-1102
Export Gas Pipeline
1
PROJECT1-FEED CONTRACTOR-OF02-E000-PR- PFD-0009
2.7 MSCMD
94
46.4
-25 / 85
49.4
51.8 km x 24' (9.53mm thickness)
7310
CS API 5L X65 + 1.5 mm CA
ASME B31.8
Future injection pressure at Location Z Receiving
Station is 70barg.
External 3 layer PE coating (3mm thick).
320-XX-1103
Export Gas Pipeline Block Valve Station
1
PROJECT1-FEED CONTRACTOR-OF02-E000-PR-PFD-0009
94
46.4
-25 / 85
49.4
4.5
Vendor Standard
ASME B31.8
24' NB Block Valve.
320-PLR-1104
Export Gas Pig Receiver
1
PROJECT1-FEED CONTRACTOR-OF02-E000-PR- PFD-0009
94
46.4
-25 / 85
49.4
Diameter (Minor/Major Barrel): 24' /30' NB Length: 10.6m
2.7
CS + 3mm CA
ASME B31.8/ ASME VIII Div 1
320-PNL-1105
Block Valve Station Solar Power System
1
Note 1
0.4
5.0 x 4.0 x 3.0
0.8
Vendor Standard
API 554
320-PIT-1106
Export Gas Drain Sump
1
ATM
ATM
-5 / 85
AMB
1.0 x 1.0 x 1.0
Lined Concrete
320-PNL-1107
HRS Solar Power System
1
Note 1
0.4
5.0 x 4.0 x 3.0
0.8
Vendor Standard
API 554
NOTE:
1. HRS and Block Valve Station electrical loads shall be optimised in order to reduce the power consumption and reduce the size of the Solar Panel during the EPC Phase.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 13 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 330
CONDENSATE STORAGE AND METERING
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
CONDENSATE STORAGE AND METERING
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
CS + 3 mm CA
330-TK-1501
Condensate Storage Tank
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0008
1600 m3 (Note 3, 5)
0.17
ATM
-5 / 85
60
15.0 ID x 12.6 H
100
with non-metallic internal lining
API 650
CS + 3 mm CA
330-TK-1502
Condensate Storage Tank
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0008
1600 m3 (Note 3, 5)
0.17
ATM
-5 / 85
60
15.0 ID x 12.6 H
100
with non-metallic internal lining
API 650
Case: Cast Iron
Note 1
Vertical Multistage
33 m3/h @ 40.3 bar
Impeller: Cast
330-P-1504A/B
Condensate Export Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0008
Can Type Centrifugal Pump
dp (Note 1)
62
75
94
40
-5 / 85
63
3.4 each
Iron
API 610 Material
Designation I-1
API 610
2 x 50% pumps. In future, the pumps may operate with a dp of 82 bar and may require revamping or replacement.
002
Case: Cast Iron
Vertical Multistage
Impeller: Cast
330-P-1505A/B
Condensate Recycle Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0008
Can Type Centrifugal Pump
16.6 m3/h @ 20.5 bar dp
21
30
28
20.5
-5 / 85
60.8
1.7
Iron
API 610 Material
API 610
Electric Driven. 2x100% pumps.
002
Designation I-1
CS + 3 mm CA
330-XX-1507
Condensate Metering Package
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0008
66 m3/h (Note 1)
94
82.1
-5 / 85
63
2.0
(Vendor specified)
LACT unit. (Note 6)
NOTE:
• Each Condensate Export Pump capacity corresponds to a nominal production rate of 5000 SBPD. Both export pumps may need to be in operation to bring down the storage inventory after a PROJECT Z shutdown.
002
• Condensate Recycle Pump is designed for turndown and reprocessing requirements.
002
• Condensate storage tanks: Each tank has 2 days storage capacity corresponding to a nominal production rate of 5000 SBPD.
• Equipment items 330-TK-1503 (Offspec Condensate Storage Tank), 330-P-1506 (Offspec Condensate Recycle Pump) and 330-P-1504C (Future Condensate Export Pump) have been deleted in Rev. 002 of this document.
002
• Condensate storage tanks: Specified capacity is the net required storage capacity. Tank dimensions include margins for ullage and dead volume and are based on API 650 typical size.
• LACT Unit comprises coriolis mass flow meter, with RVP analyser, BS&W monitor and density measurement.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 14 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 360 WELL FLOWLINES
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
WELL FLOWLINES
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
Diameter (minor/major
ASME VIII DIV 1 /
360-PLR-0201
Mobile Pig Launcher
1
Note 1
FV / 94
-25 / 85
barrel): 6 /10.75 NB
2.0
CS + 3mm CA
Packaged item
B31.8
Length = 5.8m
Diameter (minor/major
ASME VIII DIV 1 /
360-PLR-0202
Mobile Pig Receiver
1
Note 1
FV / 94
-25 / 85
barrel): 6 /10.75 NB
2.0
CS + 3mm CA
Packaged item
B31.8
Length = 8.5m
360-PL-0210
Wellhead flowline
1
PROJECT1-FEED CONTRACTOR-OF01-E000-PR-
94
61
-25 / 85
50
7.5 km & 6 NB
220
CS API 5L X52 + 3mm CA
ASME B31.8 /
Well 2-1. Notes 4, 7
PFD-0011
NT109.01
360-PL-0211
Wellhead flowline
1
PROJECT1-FEED CONTRACTOR-OF01-E000-PR-
94
59
-25 / 85
50
7.4 km & 6 NB
220
CS API 5L X52 + 3mm CA
ASME B31.8 /
Well 2-2. Notes 4, 7
PFD-0011
NT109.01
360-PL-0212
Wellhead flowline
1
PROJECT1-FEED CONTRACTOR-OF01-E000-PR-
94
62
-25 / 85
50
6.3 km & 6 NB
185
CS API 5L X52 + 3mm CA
ASME B31.8 /
Well 5-1. Notes 4, 7
PFD-0011
NT109.01
360-PL-0213
Wellhead flowline
1
PROJECT1-FEED CONTRACTOR-OF01-E000-PR-
94
68
-25 / 85
50
20.0 km & 6 NB
580
CS API 5L X52 + 3mm CA
ASME B31.8 /
Well 6-1. Notes 4, 7
PFD-0011
NT109.01
360-PL-0214
Wellhead flowline
1
PROJECT1-FEED CONTRACTOR-OF01-E000-PR-
94
82
-25 / 85
50
20.5 km & 6 NB
590
CS API 5L X52 + 3mm CA
ASME B31.8 /
Well 4-1. Notes 4, 7
PFD-0011
NT109.01
360-PL-0215
Wellhead flowline
1
PROJECT1-FEED CONTRACTOR-OF01-E000-PR-
94
73
-25 / 85
50
13.0 km & 6 NB
380
CS API 5L X52 + 3mm CA
ASME B31.8 /
Well 3-1. Notes 4, 7
PFD-0011
NT109.01
360-PL-0216
Wellhead flowline
1
PROJECT1-FEED CONTRACTOR-OF01-E000-PR-
94
59
-25 / 85
50
3.4 km & 6 NB
120
CS API 5L X52 + 3mm CA
ASME B31.8 /
Well 1-1. Notes 4, 7
PFD-0011
NT109.01
360-PL-0217
Wellhead flowline
1
PROJECT1-FEED CONTRACTOR-OF01-E000-PR-
94
58
-25 / 85
50
1.5 km & 6 NB
50
CS API 5L X52 + 3mm CA
ASME B31.8 /
Project1-1. Notes 4, 7
002
PFD-0011
NT109.01
360-PL-0218
Methanol Line for Project1
1
PROJECT1-FEED CONTRACTOR-OF01-E000-PR-
383
Approx.
-5 / 85
50
1.5km & 2 NB
17
CS API 5L X52 + 3mm CA
ASME B36.10
Note 5, 8
PFD-0011
280
B31.4/ NT 109.02
360-PL-0219
Methanol Line for Well 2 1/2
1
PROJECT1-FEED CONTRACTOR-OF01-E000-PR-
383
Approx.
-5 / 85
50
10.54km & 2 NB
120
CS API 5L X52 + 3mm CA
ASME B36.10
Note 5, 8
PFD-0011
280
B31.4/ NT 109.02
360-PL-0220
Methanol Line for Well 4 / Well 3 / Well 5
1
PROJECT1-FEED CONTRACTOR-OF01-E000-PR-
383
Approx.
-5 / 85
50
24.19km & 2 NB
270
CS API 5L X52 + 3mm CA
ASME B36.10
Note 5, 8
PFD-0011
280
B31.4/ NT 109.02
360-PL-0221
Methanol Line for Well 6 / Well 1
1
PROJECT1-FEED CONTRACTOR-OF01-E000-PR-
383
Approx.
-5 / 85
50
19.75km & 2 NB
220
CS API 5L X52 + 3mm CA
ASME B36.10
Note 5, 8
PFD-0011
280
B31.4/ NT 109.02
NOTE:
• One portable skid mounted Mobile pig launcher and Mobile pig receiver common for all wells. Dimensions based on typical supplier information.
• Deleted.
002
• All flowlines to be buried and provided with an external 3 layer PE coating (3 mm thk).
• Flowline wall thickness is 7.11mm for all flowlines. Corrosion allowance for flowline specified at 3mm by COMPANY Laboratory in Country2 (FEED Contractor recommendation is for 6mm CA).
002
• Methanol lines from FACILITY to Wellheads are routed along the flowlines in trenches. Methanol line thickness: 8.74mm.
• All Wellheads shall be provided with PSVs including vent stacks. This is for over-pressure protection of the flowlines (Technical Note - Flowline Pressure Protection; PROJECT1-FEED CONTRACTOR-MUL-0000-PR-TNO-0001).
002
• Pipeline depressuring rate shall confirm the minimum design temperature of the pipelines.
• The methanol injection line to the wellheads are represented by lines 2 -XA-360-GGG-25CH3M on P&ID PROJECT1-FEED CONTRACTOR-OF01-E360-PR-PID-0001. See also notes 2, 3 and 4 on the same P&ID.
• Equipment tags 360-KO-0203 to 0209 (Flowline Relief Knock Out Drums) have been deleted in Rev. 002 of this document.
002
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 15 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 400 COOLING MEDIUM
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
COOLING MEDIUM
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
400-PK-1901
Refrigeration Package (comprising):
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0009
Note 1, 2
1071 (thermal)
HOLD 4
400-RCV-1903
Refrigerant Receiver Drum
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0009
5.3 m
HOLD 4
20.3
HOLD 4
60
1.5 ID x 4.5 T/T
7.0
Vendor Specified
ASME VIII Div 1
Yes
Part of Refrigeration Package.
400-KO-1904
Suction Drum
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0009
HOLD 4
3.5
HOLD 4
1.5
1.3 D x 2.6 T/T
3.5
Vendor Specified
ASME VIII Div 1
Yes
Part of Refrigeration Package.
400-CLR-1905
Condenser (Air Cooler)
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0009
Air Cooler
1,604
60
HOLD 4
21.0
HOLD 4
In: 81 Out: 60
12.5 x 4.8 x 5.0
20.0
Vendor Specified
ASME VIII DIV 1 API 661
Part of Refrigeration Package. 1 Bay - 2 Fans. Fan duty = 41 kW
400-K-1906
Refrigerant Compressor
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0009
Screw
532
640
HOLD 4
In: 3.4 Out: 21
HOLD 4
In: 1.1 Out: 81
20.0
Vendor Specified
API 619
Yes
Note 4
Part of Refrigeration Package. 1 x 100% compressor.
002
400-PK-1902
Refrigeration Storage Vessel Package
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0009
Note 3
7.5 m
18
-25 / 85
1.37 OD x 4.7 T/T
2.0
Vendor Specified
ASME VIII Div 1
HOLD 4
NOTE:
• Package equipment and duties are based on vendor information in Phase 1. To be confirmed with supplier in EPC.
• Refrigeration based on propane refrigerant.
• Tote tank containing refrigerant will be delivered to Site and held in-place on a permanent basis to replenish the system inventory in case of losses. Propane inventory required is approximately 3.5 te. Dimension shown above is for typical 2000 US gallon propane tote tank.
• Space and Tie-ins shall be provided within the package unit for future installation of a spare compressor.
002
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 16 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 410 HEATING MEDIUM
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
HEATING MEDIUM
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
410-PK-1801
Heating Medium Package (comprising):
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0008
Notes 1, 2
HOLD 4
410-EX-1802
Heating Medium Expansion Drum
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0008
Note 1
4 m3
15
3.5
-5 / 235
135
1.3 ID x 3.9 T/T
1.0
Vendor Specified
ASME VIII Div 1
Yes
Part of Heating Medium Package
410-P-1803A/B
Heating Medium Circulation Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0008
Centrifugal (Note 1)
263 m3/h each @ 7 bar dp
85 each
115
15
10
-5 / 235
135
2.0
Vendor Specified
API 610
Yes
Part of Heating Medium Package
410-F-1804
Heating Medium Filter
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0008
Note 1
15
10
-5 / 235
135
0.5
Vendor Specified
ASME VIII DIV 1
Yes
Part of Heating Medium Package
410-FH-1805
Heating Medium Fired Heater
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0008
Note 1
6,100
15
10
-5 / 235
220
5.0 OD x 14 H
27.0
Vendor Specified
API 560 / 530
Yes
Part of Heating Medium Package
410-CLR-1806
Heating Medium Dump Cooler
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0008
Air Cooler (Note 1)
2,133
37
142 (Bare)
15
8.5
-5 / 235
185
2.5 x 4.6
7.3
Vendor Specified
API 661
Part of Heating Medium Package
2 bays - 2 fans per bay. Total Fan duty = 18 kW
410-V-1807
Heating Medium Drain Vessel
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0008
35 m3
3.5
0.05
-5 / 185
135
2.6 ID x 7.5 T/T
8.1
CS + 3mm CA Externally Coated
ASME VIII Div 1
410-P-1808A/B
Heating Medium Drain Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0008
5 m3/h @ 8 bar dp
2.8
4.0
13
8.5
-5 / 185
135
1.0
CS case with CS impeller. API 610 material designation S-9
API 610
NOTE:
• Package equipment and duties are typical. To be confirmed with supplier during EPC. The Heating Medium Package shall comprise several skids.
• The heating medium system comprises two temperature levels of hot oil supply to consumers: Heating medium temperature to Condensate Stabilisation Reboiler and Inlet Heater will be 220°C; while that to Amine Regeneration Reboiler will be 160°C. Typical controls within the package unit are shown in the UFD, which should be confirmed by supplier in EPC.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 17 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 420 CHEMICAL INJECTION
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
CHEMICAL INJECTION
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
420-PK-2801
Chemical Injection Package (Process)
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-
Approx.
Approx.
65
55.0
-5 / 85
50
3.0 x 4.0 x 3.0
16.0
SS (Vendor
API 675
Notes 1, 2, 5
UFD-0006
1
2
Specified)
420-PK-2802
Chemical Injection Package (Produced Water)
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-
Approx.
Approx.
10
3.0
-5 / 85
50
3.0 x 3.0 x 2.0
10.0
SS (Vendor
API 675
Notes 3, 4, 5
UFD-0006
1
2
Specified)
NOTE:
1. The injection chemicals for process typically are corrosion inhibitor, anti-foam, scale inhibitor, demulsifier etc
2. The Chemical Injection Package for process comprises of (HOLD 4):
• Multicompartmented tank (4 compartments)
• Dosing pumps - Multihead dosing pumps (2 x 100%) with 2 heads each are required for Antifoam injection;
- Multihead dosing pumps (3 x 50% - 2 operating + 1 standby) with 4 heads each are required for Corrosion Inhibitor. The same applies to Scale Inhibitor injection, if required.
- 2 x 100% dosing pumps for Demulsifier
• Mixers (one per compartment)
3. The injection chemicals for produced water are corrosion inhibitor, reverse demulsifier, biocide, etc.
4. The Chemical Injection Package for Produced Water system comprises of (HOLD 4):
• Multicompartmented tank (3 compartments)
• Dosing pumps (3 operating + 3 standby)
• Mixers (3; one per compartment)
5. For details, refer Chemical Injection Packages datasheet (PROJECT1-FEED CONTRACTOR-PF01-E420-PR-DAT-0028)
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 18 of 35
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
FLARE
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
EQUIPMENT LIST DETAILS SYSTEM CODE: 430
FLARE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
430-VD-1701
HP Flare KO Drum
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0003
Gas: 104427 kg/h (2.8 MSCMD) Liquid: Liquid: 45352 kg/h (57 m3/h)
FV / 10
4.0
-46 / 160
50
2.8 ID x 6.5 T/T
12.0
CS • 3mm CA with non-metallic internal lining
ASME VIII Div 1
Yes
430-P-1702A/B
HP Flare KO Drum Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0003
Centrifugal
24.2 m3/h @ 2.5 bar dp
2.9
5.5
15
2.9
-5 / 85
50
1.0
Case: CS Impeller: CS API 610 Material Designation S-5
API 610
430-SK-1703
HP Flare Stack
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0003
Package Unit (Note 2)
Gas: 104427 kg/h (2.8 MSCMD) (Note 1)
10
3.2
-46 / 160
50
Flare stack diameter 18"; Flare tip diameter 16"; Stack ht - 35m (Note 1)
16.0
Vendor Specified
API 537 / API 521
430-BIG-1704
Ignition Package
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0003
Package Unit (Note 3)
0.7
Vendor Specified
Common for HP and LP Flare
430-VD-1705
LP Flare KO Drum
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0004
Gas: 32030 kg/h (0.34 MSCMD)
Liquid: 9354 kg/h (9.4 m3/h)
FV / 3.5
0.3
-5 / 210
50
1.8 ID x 5.0 T/T
4.0
CS • 3mm CA with non-metallic internal lining
ASME VIII Div 1
430-P-1706A/B
LP Flare KO Drum Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0004
Centrifugal
5.5 m3/h @ 2.7 bar dp
1.3
2.2
8
3.2
-5 / 85
50
1.0
Case: CS Impeller: CS API 610 Material Designation S-5
API 610
430-SK-1707
LP Flare Stack
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0003
Package Unit (Note 2)
Gas: 32030 kg/h (0.34 MSCMD) (Note 1)
3.5
0.15
-5 / 210
50
Flare stack diameter 16"; Flare tip diameter 16" ; Stack ht - 26m (Note 1)
15.0
Vendor Specified
API 537 / API 521
430-SK-1708
CO2 Vent Stack
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0003
Package Unit
1814 kg/h (25544 SCMD)
3.5
0.2
-5 / 150
54
6" vent Stack ht - 20m
2.0
Vendor Specified
430-EH-1709
HP Flare KO Drum Heater
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0003
Electric Heater
40
10.0
-46 / 160
0.5
Element: 316L SS
430-EH-1710
LP Flare KO Drum Heater
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0004
Electric Heater
15
3.5
-5 / 210
0.3
Element: 316L SS
NOTE:
• HP and LP Flare System capacity and equipment sizes to be confirmed during EPC phase after a Flare and Blowdown Study.
• HP and LP Flare Stack packages typically include:
- Flare Tip Assembly
- Flare Stack and Pilot Gas Riser
- Seal
- Pilot Gas System
- Pilot Gas Back-Up (Propane)
• Redundant Ignition and Monitoring Systems required. One of the ignition sources shall be electronic flare ignition type.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 19 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 440
PRODUCED WATER TREATMENT
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
PRODUCED WATER TREATMENT
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
440-V-1301
Produced Water Flash Drum
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-PFD-0007
Horizontal Vessel
10.2 m3/h
FV / 5
1.0
-25 / 85
50
1.2 ID x 3.5 T/T
2.8
CS + 3mm CA ; non-metallic Internal lining
ASME VIII Div I
440-P-1302 A/B
Produced Water Feed Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0007
Centrifugal
10.2 m3/h @ 3 bar dp
1.8
3.0
10
4
-5 / 85
50
1.7
Case: DSS Impeller: DSS API 610 Material Class D1 or D2
API 610
Electric Drive Motor.
440-PK-1303
Produced Water Treatment Package
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0007
Note 3
10.2 m3/h
10
10
Vendor Specified
HOLD 4
002
440-PIT-1304A/B
Evaporation Pond
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0007
-5 / 85
50
120 x 120 x 1.5
Geo-Textile Lined
Evaporation Ponds to be internally lined with Geo-Textile Membrane.
440-PK-1305A/B
Oil Skimmer Package
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-PFD-0007
2
One for each Evaporation Pond. HOLD 4.
440-PIT-1306
Offspec Water Pit
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0007
-5 / 85
50
10 x 10 x 1.5
Geo-Textile Lined
To be internally lined with Geo-Textile Membrane
NOTE:
• Produced Water unit capacity based on produced water flow rate of approximately 7 m3/h (Note 2) and a design margin for processing oily water from open drains system and water draw-off from Condensate Stabilisation Column.
• Produced Water flow rate of 7 m3/h is pro-rated from the Rich Winter Heat and Material Balance to correspond to 7,000 SBPD condensate product from FACILITY.
• The Produced Water Treatment Package typically includes a CPI Separator and an Oil Transfer Pump. Space and tie-ins shall be provided within the package for future installation of secondary treatment, e.g. Induced Gas Flotation (IGF) Unit.
002
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 20 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 450 FUEL GAS
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
FUEL GAS
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
450-EH-2401
Fuel Gas Heater
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0014
Electrical
80
FV / 35
30
-25 / 85
30 - 70
0.8
CS + 3 mm CA Element: CS
002
450-KO-2402
HP Fuel Gas KO Drum
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0014
0.12 MSCMD
FV / 35
30
-25 / 85
30 - 70
0.8 ID x 2.4 T/T
2.5
CS + 3 mm CA 316L SS internals
ASME VIII Div 1
Yes
002
450-F-2403A/B
Fuel Gas Filter / Separator
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0014
0.12 MSCMD
FV / 35
30
-25 / 85
30 - 70
0.6 x 1.5
1.0
CS + 3 mm CA 316L SS internals
ASME VIII Div 1
Yes
002
450-KO-2404
LP Fuel Gas KO Drum
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0014
0.06 MSCMD
FV / 10
5
-25 / 85
30 - 70
0.8 ID x 2.4 T/T
2.0
CS + 3 mm CA 316L SS internals
ASME VIII Div 1
Yes
002
NOTE:
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 21 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 460 METHANOL INJECTION
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
METHANOL INJECTION
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
460-P-2901
Methanol Offloading Pump
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0006
Centrifugal
10 m3/h @ 3 bar dp
2.8
4.0
7
3
-5 / 85
50
1.0
Case: CS, Impeller: CS API 610 Material Designation S-4
API 610
460-TK-2902
Methanol Storage Tank
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0006
150 m3
0.05
ATM
-5 / 85
50
6.0 ID x 7.2 H
18.0
CS + 3mm CA with no- metallic internal lining
API 650
Yes
Note 1
460-P-2903A/B
Methanol Distribution Pumps For FACILITY
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0006
Metering Pump
0.82 m3/h @ 58 bar
dp
3
5.0
65
58
-5 / 85
50
1.0
Case: CS, Impeller: CS API 610 Material Designation S-4
API 675
HOLD 3 - Capacity
460-P-2904A/B
Methanol Distribution Pumps For Wellheads
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0006
Diaphragm Pump
3.1 m3/h @ 320 bar
dp
49
60
383
320
-5 / 85
50
1.0
Case: CS, Impeller: CS API 610 Material Designation S-4
API 675
Note 1
NOTE:
• Methanol tank capacity based on one week's capacity considering an ambient soil temperature of 16°C. Wellhead distribution pump capacity based on maximum requirement considering an ambient soil temperature of 10°C.
• Methanol supply and unloading requirements to be confirmed in EPC phase.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 22 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 470 CHLORINATION
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
CHLORINATION
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
470-PK-2601
Chlorination Unit
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0015
Note 1
Note 2
12
8
-5 / 85
50
2.0 x 2.0 x 3.0
2.0
Titanium / CPVC
Vendor to confirm material selection
NOTE:
• The Chlorination Package comprises chemical tank with mixer and dosing pumps.
• Chlorination unit capacity suitable for treatment of 30 m3/h Aquifer Water.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 23 of 35
EQUIPMENT LIST DETAILS
SYSTEM CODE: 480
UTILITY MISCELLANEOUS
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
UTILITY MISCELLANEOUS
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
480-TK-0801
Amine Storage Tank
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0001
29 m3
0.05
ATM
-5 / 85
50
3.35 m OD x 4.6 m H
4.5
CS • 3mm CA with non- metallic internal lining. System 5 up to 1m from tank bottom
API 12F
480-A-0802
Amine Storage Tank Mixer
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0001
5.5
0.2
316L SS
480-P-0803A/B
Amine Transfer Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0001
Centrifugal
5 m3/h @ 6 bar dp
2.1
3.0
10
6
-5 / 85
50
1.0
Case: 316L SS, Impeller: 316L SS API 610 material designation S-9
API 610
480-EH-0804
Amine Storage Tank Heater
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0001
Electric
10.0
Element: 316L SS
480-V-0805
Amine Drain Vessel
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0001
Horizontal Vessel
15 m3
FV / 3.5
0.01
-5 / 85
50
2.2 x 6.0 (ID x TT)
5.5
CS • 3 mm CA External lining and CP
ASME VIII Div 1
480-P-0806A/B
Amine Drain Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0001
Sump Pump
5 m3/h @ 5 bar dp
1.7
3.0
10
5
-5 / 85
50
0.7
Case: 316L SS, Impeller: 316L SS API 610 material designation S-9
API 610
480-EH-0807
Amine Drain Vessel Heater
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0001
Electric
5.0
3.5
0.2
Element: 316L SS
480-TK-0808
Glycol Storage Tank
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0002
15 m3
0.05
ATM
-5 / 85
50
2.93 OD x 3.65 H
3.5
CS • 3mm CA
API 12F
480-P-0809A/B
Glycol Transfer Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0002
Centrifugal
3 m3/h @ 6 bar dp
1.2
3.0
11
6
-5 / 85
50
1
Case: 316L SS, Impeller: 316L SS API 610 material designation S-9
API 610
480-EH-0810
Glycol Storage Tank Heater
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0002
Electric
10.0
0.2
Element: 316L SS
480-V-0811
Glycol Drain Vessel
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0002
Horizontal Vessel
10 m3
FV / 3.5
0.01
-5 / 85
50
1.9 x 6.0 (ID x TT)
4.5
CS • 3 mm CA External lining and CP
ASME VIII Div 1
480-P-0812A/B
Glycol Drain Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0002
Centrifugal
5 m3/h @ 5 bar dp
1.7
3.0
11
5
-5 / 85
50
1.00
Case: 316L SS, Impeller: 316L SS API 610 material designation S-9
API 610
480-EH-0813
Glycol Drain Vessel Heater
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0002
Electric
5.0
3.5
0.20
Element: 316L SS
NOTE:
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 24 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 500
AQUIFER / PLANT WATER
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
AQUIFER / PLANT WATER
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
500-F-2601A/B
Aquifer Water Filter
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0015
30 m3/h
12
8
-5 / 85
50
0.5
CS + Rubber lining
ASME VIII Div 1
500-TK-2602A/B
Plant Water Storage Tank
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0015
Note 1
115 m3
ATM
ATM
-5 / 85
50
4.7 OD x 7.3 H
10
CS + 3mm CA with non-metallic lining
API 12F
500-P-2603A/B
Plant Water Transfer Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0015
32 m3/h @ 8.5 bar
dp
15.0
20.0
12
8
-5 / 85
50
1.0
Case: 316L SS, Impeller: 316L SS
ISO 5199 / ASME B73.1
NOTE:
1. Plant water capacity quoted is nominal capacity corresponding to two days storage of normal requirement of plant water (includes requirements for production of fresh water and demin water) and make-up for fire water. See also Note 1 on Page 26.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 25 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 530
FRESH/POTABLE/DEMINERALISED WATER
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
FRESH/POTABLE/DEMINERALISED WATER
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
530-PK-3101
Fresh Water RO Treatment Package
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0015
1.75 m3/h
5.0
8
5.0
-5 / 85
50
5.0
316L SS (Vendor Specified)
HOLD 4
530-TK-3102A/B
Fresh Water Storage Tank
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0015
50 m3 each
ATM
ATM
-5 / 85
50
3.66 OD x 6.1 H
7.0
CS + 3mm CA with non-metallic lining
API 12F
530-P-3103A/B
Fresh Water Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0015
35 m3/h @ 5.5 bar
dp
10.5
15.0
8
5.7
-5 / 85
50
1.0
Case: 316L SS, Impeller: 316L SS
ISO 5199 / ASME B73.1
530-PK-3104
Demin Water Polishing Package
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0015
0.5 m3/h
5.0
8
3
-5 / 85
50
1.0
Vendor specified
ISO 5199 / ASME B73.1
HOLD 4
530-TK-3105
Demin Water Storage Tank
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0015
45 m3
0.05
ATM
-5 / 85
50
3.66 OD x 6.1 H
7.0
CS + 3mm CA with non-metallic lining
API 12F
530-P-3106A/B
Demin Water Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0015
1.6 m3/h @ 4.7 bar
dp
1.0
2.2
8
4.7
-5 / 85
50
1.0
Case: 316L SS, Impeller: 316L SS
ISO 5199 / ASME B73.1
530-PK-3107
Chemical Dosing Package
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0015
Note 3
8
5
-5 / 85
50
12.0
316L SS (Vendor Specified)
API 675
Note 2
NOTE:
• Fresh water and demin water storage capacity quoted is required working volume corresponding to seven days storage of their normal requirements.
• Chemicals for water treatment typically are biocide and regeneration chemicals for Demineralisation Unit.
• Chemical Dosing Package comprises (HOLD 4): - Multi-compartmented Tank (3 compartments) - Dosing Pump (3 operating + 3 standby) - Mixers (3; one per compartment)
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 26 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 560 OPEN DRAINS
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
OPEN DRAINS
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
560-PIT-3001
Open Drains Sump
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0005
NOTE 1
ATM
ATM
-5 / 85
50
4.0 x 4.0 x 2.5
Lined Concrete
560-P-3002A/B
Open Drains Sump Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0005
2 m3/h @ 3.0 bar dp
0.5
1.1
8.0
3.0
-5 / 85
50
1.0
Case: UNS S31803 Impeller: UNS S3183 API 610 Material Designation D1
560-A-3003
Open Drain Oil Skimmer Package
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0005
Vendor Specified
Located within Open Drains Sump
NOTE:
1. The Open Drains Sump is designed to handle a maximum drainage volume of 5 m3 in one day at a maximum rate of 15 m3/h.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 27 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 570 CLOSED DRAINS
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
CLOSED DRAINS
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
570-V-2101
Closed Drains Vessel
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0005
32 m3
3.5
0.1
-5 / 85
50
2.7 ID x 8.5 T/T
8.7
Shell: CS + 3mm CA with non-metallic lining, external coating and CP
ASME VIII Div 1
Internal Lining
(Epoxy
Coating) Located in a Concrete Pit
570-P-2102A/B
Closed Drains Transfer Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0005
Centrifugal
5 m3/h @ 22 bar dp
10.0
14.0
31
22.0
-5 / 85
50
0.6
Case: UNS S31803 Impeller: UNS S3183 API 610 Material Designation D1
API 610
570-EH-2103
Closed Drains Vessel Heater
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0005
Electric
40
3.5
-5 / 85
Element: 316L SS
NOTE:
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 28 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 620 DIESEL OIL
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
DIESEL OIL
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
620-TK-2001
Diesel Storage Tank
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0011
60 m3
0.05
ATM
-5 / 85
50
4.7 OD x 4.9 H
9.0
CS + 3mm CA with non-metallic internal lining at bottom of tank
API 12F
Capacity based on 3 days storage at maximum diesel consumption.
620-P-2002A/B
Diesel Transfer Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0011
5 m3/h @ 2.5 bar dp
1.0
2.2
7
4.0
-5 / 85
50
1.0
Case: CS Impeller: Cast iron API 610 material designation S-1
API 610
620-FC-2003
Diesel Filter
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0011
5 m3/h
7
4.0
-5 / 85
50
1.0
CS + 3mm CA with non-metallic internal lining
NOTE:
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 29 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 630
INSTRUMENT AND PLANT AIR
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
INSTRUMENT AND PLANT AIR
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°CMaterials
Size
L x W x H
m
Weight (each)
tonnes
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
630-K-2201A/B
Air Compressor
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0012
Oil-free Screw type
760 Sm3/h
111
132
12
10.0
-5 / 85
50
4
CS (Vendor specified)
API 619 / ISO10440
Note 1, HOLD 4
002
630-VL-2202
Plant Air Receiver
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0012
15 m3
12
10.0
-5 / 85
50
1.8 ID x 5.4 T/T
6
Shell: CS + 3mm CA with non-metallic internal lining
ASME VIII Div 1
002
630-PK-2203A/B
Air Drier Package
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0012
Each comprises two towers.
660 Sm3/h
12
9.5
-5 / 85
50
5
Vendor Specified
ASME VIII Div 1
Capacity quoted is instrument (dry) air flow rate. Note 1, HOLD 4
002
630-VL-2204
Instrument Air Receiver
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0012
40 m3
12
9.0
-5 / 85
50
2.5 ID x 7.3 T/T
11
Shell: CS + 3mm CA with non-metallic internal lining
ASME VIII Div 1
002
NOTE:
1. The maximum instrument air demand is 660 Sm3/hr. The Air Compressor Capacity includes an additional 15% margin which has been assumed for drier bed regeneration, giving a total air compressor capacity of 760 Sm3/hr. Supplier to confirm the regeneration air flow requirement.
002
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 30 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 640 INERT GAS
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
INERT GAS
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
640-PK-2701
Nitrogen Generator Package
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0013
Note 1
90 Sm3/h
5
12
9
-5 / 85
50
1.0
Vendor specified
HOLD 4
002
640-RCV-2702
Nitrogen Receiver
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0013
Vertical Process Vessel
38 m3
12
7
-5 / 85
50
2.5 x 7.0 (ID x TT)
11.0
Shell: CS + 3mm CA with 316L SS internals
ASME VIII DIV I
002
640-PK-2703
High Purity Nitrogen Bottles Skid
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0013
20 Sm3/h
Vendor Specified
HOLD 4
NOTE:
1. Nitrogen Generation Package typically includes:
- Inlet Carbon Filters (2x100%)
- Inlet Heater (1x100%)
- Membrane Separators (with 20% spare membranes)
002
002
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 31 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 660 SEWAGE TREATMENT
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
SEWAGE TREATMENT
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure
barg(each)
Temperature.
°C
Size
L x W x H
m
Weight tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
660-PK-3201 A/B/C/D
Sewage Sump Package
4
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0016
Septic Tank
5.0 m3
Vendor Specified
Vendor Specified
-5 / 85
50
1.0
Vendor Specified
HOLD 3 - quantity, capacity
002
NOTE:
1. Equipment Tag 660-PK-3202 (Waste Water Treatment Package) has been deleted in Rev 002 of this document.
002
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 32 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 710 FIRE WATER
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
FIRE WATER
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
710-TK-2301
Firewater Storage Tank
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0007
Note 1
2836 m3
ATM
ATM
-5 / 85
50
18 ID x 14.4 H
120
CS + 3mm CA with non-metallic internal lining
API 650
002
710-P-2302
Electric Firewater Pump
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0007
350 m3/h ® 10 bar
dp
130
150
16
10.0
-5 / 85
50
6
Case: Ni Al Bz Impeller: Ni Al Bz
NFPA 20
3 x 50% Firewater pump configuration
002
710-PK-2303A/B
Diesel Firewater Pump Package
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0007
Note 4
350 m3/h ® 10 bar
dp
130
150
16
10.0
-5 / 85
50
15.0
Vendor Specified
NFPA 20
3 x 50% Firewater pump configuration
002
710-P-2305A/B
Fire Water Jockey Pump
2
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0007
10 m3/h ® 10 bar dp
8.0
11
16
10.0
-5 / 85
50
2.0
Case: Ni Al Bz Impeller: Ni Al Bz
NFPA 20
2 x 100% electric pumps
002
710-A-2306
Foam Package (Condensate Storage Area)
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0007
Note 2
21 m3/h ® 11 bar dp
11
15
16
11.0
-5 / 85
50
2.0
CS + 3mm CA with non-metallic internal lining
NFPA 20 API 650
HOLD 4
710-A-2307
Foam Package (Methanol Storage Area)
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0007
Note 3
CS + 3mm CA with non-metallic internal lining
NFPA 20 API 650
HOLD 4
710-A-2310
Deluge Skid
(Methanol Tank) (460-TK-2902)
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0007
NFPA 15
HOLD 4
710-A-2311
Deluge Skid
(Condensate Tank) (330-TK-1501)
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0007
NFPA 15
HOLD 4
710-A-2312
Deluge Skid
(Condensate Tank) (330-TK-1502)
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0007
NFPA 15
HOLD 4
710-A-2313
Deluge Skid
(Offspec Condensate Tank) (330-TK-1503)
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0007
NFPA 15
HOLD 4
NOTE:
• Fire Water Unit designed to cater for only the Condensate Storage Tanks. Accordingly, there will be no ring main and jockey pumps
• Foam Package (Condensate Storage Area) contains Foam Pump and Foam Storage Tank (20m3).
• Foam Package (Methanol Storage Area) contains Foam Storage Tank (1.35 m3).
• Diesel Firewater Pump Package also contain diesel tank storage of 1 m3.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 33 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 800
MAIN POWER GENERATION
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
MAIN POWER GENERATION
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
800-GT-2001
Gas Turbine Generator
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0010
Note 1
4.0 MW
12 x 5.8 x 8.1
60
Vendor Standard
API STD 616
Typically 6.75 MW ISO rated gas turbine (SGT-200)
800-GT-2002
Gas Turbine Generator
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0010
Note 1
4.0 MW
60
Vendor Standard
API STD 616
Typically 6.75 MW ISO rated gas turbine (SGT-200)
NOTE:
• 2 x 100% duty Gas Turbine Generator Packages, each for 4 MW power output.
• Overall package dimensions for 2 machines. GTG skid alone is significantly smaller.
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 34 of 35
EQUIPMENT LIST DETAILS SYSTEM CODE: 830
EMERGENCY POWER GENERATORS
Project
PROJECT1 DEVELOPMENT PROJECT
Originated By
LY
Client
COMPANY
Checked By
JL
Location
EMERGENCY POWER GENERATORS
Approved By
CF
Job No.
PROJECT NUMBER
Revision
002
Doc No.
Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001
Date
DATE
Tag Number
Equipment Name
QTY
PFD No.
Package Notes
Capacity
Duty kW
Instal. Power
kW
Surface Area (m2)
Pressure barg
Temperature.
°C
Size
L x W x H
m
Weight (each)
tonnes
Materials
Design Code
Internals
Insulation
Remarks
Rev Flag
Design
Oper
Design
Oper
830-GD-2001
Emergency / Standby Diesel Generator
1
PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0010
750
7.5 x 4.0 x4.0
30
CS (Vendor Standard)
IEC-60034
NOTE:
PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 35 of 35