This document has been developed from the Phase 1 document number, Project1-FEED CONTRACTOR-FACILITY-0000-PR-LST-0001 Rev 006, incorporating SAP coding requirements and technical updates. PROJECT1 DEVELOPMENT PROJECT EQUIPMENT LIST 002 Approved for Design LY" CF DATE 001 Issued for Approval JG JL CF DATE 000 Issued for Review JG JL CF DATE A01 Inter-discipline check JG JL DATE REV DESCRIPTION ORIG CK'D APP'D DATE ORIGINAL DRAWING SIZE: A3 SCALE: NONE EQUIPMENT LIST CLIENT : COMPANY ELECTRONIC FILE: Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Project1-FEED CONTRACTOR--MUL-E000- PR-LST-0001 SH. 1 of 35 PROJECT1 DEVELOPMENT PROJECT EQUIPMENT LIST Page 1 of 35 Project1-FEED CONTRACTOR-MUL-E000-PR-LST-0001 Rev 002 Rev. 002 EQUIPMENT LIST DETAILS GENERAL NOTES & HOLDS Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location NOTES & HOLDS Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001 Date DATE General Notes: 1 - Pages have been ordered as per System Code. 2 - Notes specific to equipment are listed in their relevant sheets. 3 - Capacity of FACILITY is 2.8 MSCMD (i.e. 2.0 MSCMD gas sales volume plus 10% shrinkage for LPG recovery at Location O plus 20% swing factor (DCQ) plus 0.1 MSCMD allowance for fuel gas). 4 - Operating conditions taken from Heat and Material balances: PROJECT1-FEED CONTRACTOR-PF01-E000-PR-CAL-0001 Heat and Material Balance: Lean Summer PROJECT1-FEED CONTRACTOR-PF01-E000-PR-CAL-0002 Heat and Material Balance: 30% Lean, 70% Rich Summer PROJECT1-FEED CONTRACTOR-PF01-E000-PR-CAL-0003 Heat and Material Balance: Lean Winter PROJECT1-FEED CONTRACTOR-PF01-E000-PR-CAL-0004 Heat and Material Balance: 30% Lean, 70% Rich Winter 5 - Aquifer water will be supplied to the FACILITY from a local aquifer well drilled at Project1. A back-up aquifer water supply will be available from the Tieret Well via a pipeline. (HOLD 2) 6 - All skids and packages will be manufactured with a requirement of easy accessibility for operation and maintenance with minimal screwed fittings. This shall be reviewed further in EPC. 7 - For more details for sizing basis of some equipment, refer to the relevant technical note: PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0001 Technical Note - FACILITY Turndown Requirements PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0002 Technical Note - Design Pressure For Mobile Units at Wellhead PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0003 Technical Note - Gas Treating Temperature PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0004 Technical Note - Equipment required for Liquid Removal from Gas PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0005 Technical Note - Purge Gas For Flare Header PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0006 Technical Note - Produced Water Disposal PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0007 Technical Note - Mercury Removal Unit Location PROJECT1-FEED CONTRACTOR-FLO-0000-PR-TNO-0001 Technical Note - Hydrate Inhibition PROJECT1-FEED CONTRACTOR-MUL-0000-PR-TNO-0001 Technical Note - Flowline Pressure Protection 8 - The basis for material selection is discussed in the following correspondences: PEL(UK)-RFI-000094 date 20/07/2012 COMPANY-MEMO-000645 date 24/07/2012 9 - The following information are preliminary in the absence of vendor data: Weights, Vendor Package Skid Dimensions, Installed Power for pumps and compressor motors, Column / Vessel Internals, Number of Air Coolers and Heat Exchanger Shells. 10 - The changes in Rev 002 of the Equipment List are based on Design and Cost Improvement Report (PROJECT1-FEED CONTRACTOR-MUL-E000-MD-REP-0004) and subsequently issued Design Change Notices (DCNs). Holds: 1 - Blowdown Study to confirm the minimum design temperatures of equipment (EPC). 2 - Aquifer water source and associated equipment (e.g. wells, pipelines) (EPC). 3 - To be confirmed (EPC). 4 - Package information to be confirmed by Supplier (EPC). PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 2 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 110 GAS WELLS Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location GAS WELLS Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 110-PNL-0101 TO 0108 Wellhead Solar Power System 8 Notes 2, 6 1.0 10 x 4 x 3 1.5 Vendor Standard 110-XR-0109 TO 0116 Chemical Injection Package 8 Note 2 0.12m3/day NOTE5 0.25 383 82 -5 / 85 50 3.0 x 2.0 x 2.5 4 each 316L SS API 675 For Corrosion Inhibitor 110-V-0117 Mobile Test Separator 1 Notes 1, 4 Gas: 0.425 MSCMD Condensate: 3300 SBPD Water: 1100 SBPD 94 82 -25 / 85 50 5.7 x 2.3 x 2.5 15 CS with 316L clad & 316 internals ASME VIII Div 1 Yes Packaged item on rental basis. 110-F-0118 Sand Filter 1 Note 1 383 280 -25 / 85 50 1.0 x 1.0 x 3.0 3.0 CS with 316L clad & 316 internals 150 micron mesh. 110-HP-0119 TO 0126 Wellhead Control Panel 8 Note 2 3.0 x 2.0 x 2.0 3.0 Vendor Standard API 554 Includes Hydraulic Well Control Panel (HWCU) 110-WHG-0151 TO 0158 Wellheads 8 PROJECT1-FEED CONTRACTOR-OF01-E000-PR-PFD-0011 Not in Contractor's Scope. NOTE: • One mobile skid mounted Mobile Test Separator and Sand Filter on rental basis common for all wells (Technical Note - Design Pressure For Mobile Units at Wellhead; PROJECT1-FEED CONTRACTOR-FACILITY-0000-PR-TNO-0002). • Well site Solar Panels, Chemical Injection Package, Hydraulic Well Control Unit (HWCU) are required per well. • Deleted. • Wellhead Mobile Test Separator package includes Test Separator, Ground Flare and Ignitor Package, Choke Manifold and Transfer Pump. • Corrosion / Scale Inhibitor injection rates to be confirmed during EPC Phase. • Wellhead electrical load shall be optimised in order to reduce the power consumption and reduce the size of the Solar Panel during the EPC Phase. • Equipment Tag 110-PK-0127 (Wellhead Water-bath Heater) has been deleted in Rev 002 of this document. 002 002 PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 3 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 200 CONDENSATE STABILISATION Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location CONDENSATE STABILISATION Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 200-HE-1401 Pre-Heater 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0002 Shell & Tube 1092 (Note 1) 40 Tube: 25 Shell: 10 Tube: 19.6 Shell: 5.3 Tube: -25 / 210 Shell: -25 / 210 Tube: In= 20 Out= 50 Shell: In= 125, Out= 79.2 0.6 ID x 6.5 T/T 3.6 Shell: CS • 3mm CA Tubes: 316L SS Note 2, 3 TEMA R ASME VIII DIV 1 Yes 200-V-1402 Water / Condensate Separator 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0002 Three Phase Horizontal Separator 25 19.1 -25 / 85 50 2.3 ID x 5.7 T/T 18.0 CS • 3mm CA with Internal Lining and 316L SS Internals Note 5 ASME VIII Div 1 Yes Plate pack internals. Weight does not include internals. 200-HE-1403 Condensate/ Condensate Heat Exchanger 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0002 Shell & Tube 1340 (Note 1) 54 Tube: 25 Shell: 10 Tube: 18.8 Shell: 6.5 Tube: -25 / 210 Shell: -25 / 210 Tube: In= 50 Out= 114 Shell: In= 177, Out= 125 0.65 ID x 6.5 T/T 4.0 Shell: CS • 3mm CA Tubes: 316L SS Note 2, 3 TEMA R ASME VIII DIV 1 Yes Maximum duty and maximum temperature are not necessarily coincident. 200-C-1404 Condensate Stabilisation Column 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0002 Packing 10 6.5 -5 / 210 177 1.1 ID x 13.3 T/T Note 4 7.5 CS with 316L SS Clad and 316L SS Internals Note 3 ASME VIII Div 1 Yes Yes Weight does not include internals. 200-V-1405 Water Draw Off Vessel 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0002 Vertical 10 6.4 -5 / 210 95 0.8 ID x 2.0 T/T 1.3 CS • 3mmCA with Internal Lining and 316L SS Internals Note 5 ASME VIII Div 1 Yes Yes 200-HE-1406 Condensate Reboiler 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0002 Kettle Type 2791 (Note 1) 170 Tube: FV / 15 Shell: FV / 10 6.5 Tube: -5 / 235 Shell: -5 / 210 Tube: 220 Shell: 177 0.9 / 2.0 ID x 7.5 L 8.0 Shell: CS•316L SS Clad Tube Side: CS • 3mm CA Tubes: 316L SS TEMA R ASME VIII DIV 1 Yes Maximum duty and maximum temperature are not necessarily coincident. 200-CLR-1407 Condensate Run Down Cooler 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0002 Air Cooler 1255 (Note 1) 44 178 (Bare Tube) 10 4.8 -5 / 135 In: 115 Out: 60 3.7 ID x 7.3 L 13.5 Heads: CS • 3mm CA Tubes: CS • Al Fins API 661 ASME VIII DIV 1 1 bay - 2 fans per bay. Total Fan duty = 27 kW NOTE: • This has been pro-rated from the Rich Winter Heat and Material Balance to correspond to 7,000 SBPD condensate product from FACILITY. • Tube sheet / channel materials: CS • 316L SS Clad • Solid CRA may be selected instead of CS Clad where cost / fabrication benefits exist. • Condensate stabilisation column dimensions are based on structured packing internals. • CS • 316L SS Clad is alternate material to internal lining. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 4 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 210 TEST SEPARATION AND METERING Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location TEST SEPARATION AND METERING Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 210-V-0301 Test Separator 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0001 Three Phase Vertical vessel Gas: 0.425 MSCMD Condensate: 3283 SBPD Water: 1094 SBPD FV / 65 54 -25 / 85 50 1.6 x 6.1 (ID x TT) 22.0 CS with 316L SS Clad and 316L SS Internals ASME VIII Div 1 Yes The weight of vessel does not include internals. Includes 3m3 slug volume NOTE: PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 5 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 220 GAS RECEPTION AND SEPARATION Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location GAS RECEPTION AND SEPARATION Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper HP Header Gas : 2.83 MSCMD HP: 55.3 Skid mounted, 8 slot manifold comprising HP, MP, LP and test production header. 220-XX-0401 Inlet Manifold - HP, MP, LP & Test Header 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- Liquid: 10355 SBPD 94 MP: 20.0 -25 / 85 50 19 m x 4.5 m 80 LTCS + 4.5 mm CA ASME B31.3 HP: 16 x 19 m long; MP: 16 x 19 m long; LP: 16 x 002 PFD-0001 (Note 1) Note 4 LP: 7.0 19 m long; Test: 6 x 19 m long Test Header Note 4 0.425 MSCMD Shell: 160 Tube: FV Tube: Shell: CS + 3mm CA Tube: Tube: In: 220-HE-0402 Inlet Heater 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- Shell & Tube 1,903 44 / 94 54.8 -25 / 235 10°C 0.7 ID x 6.5 T/T 5.0 Tubes: UNS S32750 TEMA R Yes PFD-0001 Shell: FV Shell: -5 / Tubesheet: UNS S32750 ASME VIII DIV 1 Shell: 10 Out: 25°C / 15 235 Channel: UNS S32750 (Note 3) Gas: 2.83 MSCMD Condensate: 9309 SBPD 220-V-0403 Inlet Separator 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0001 Three Phase Vertical vessel (Note 1) FV / 65 54.3 -25 / 85 50 2.2 ID x 7.3 T/T 42.0 CS with 316L SS Clad and 316L SS Internals ASME VIII Div 1 Yes Weight does not include internals. Includes 3 m3 slug volume. Water: 1046 SBPD (Note 1) NOTE: 1. This has been pro-rated from the Rich Winter Heat and Material Balance to correspond to 7,000 SBPD condensate product from FACILITY. • Inlet manifold will have provision to extend the headers for connection of future wells. • During summer, the Inlet Heater will be bypassed. • Skid shall be divided into two units for transportation purposes. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 6 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 232 OFFGAS COMPRESSION Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location OFFGAS COMPRESSION Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper Offgas Compression Train consists of (Note 1,2): 232-VG-1001 1st Stage Offgas Compression Suction Scrubber 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0003 Vertical Vessel FV / 13 5.4 -25 / 150 74.6 0.8 ID x 1.9 T/T 1.5 CS • 316L SS Clad with 316L SS Internals ASME VIII DIV 1 Yes Yes 002 232-K-1002 1st Stage Offgas Compressor 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0003 Reciprocating (Note 3) 6336 Sm3/h 284 800 (Note 3) 25 In: 5.3 Out: 18.5 -25 / 160 In: 74.3 Out: 130 18 (Note 3) Vendor Specified API 618 13.2 bar differential. (HOLD 4) 002 232-CLR-1003 1st Stage Offgas Compression Discharge Cooler 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0003 Air Cooler 1,022 30 178 (Bare Tube) FV / 25 18.5 -25 / 160 In: 130 Out: 60 3.7 x 7.3 14.0 316L SS tubes • header API 661 ASME VIII DIV 1 1 bay - 2 fans per bay. Total Fan duty = 22 kW 002 232-VG-1004 2nd Stage Offgas Compression Suction Scrubber 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0003 Vertical Vessel FV / 40 18 -25 / 115 47.4 1.0 ID x 2.3 T/T 2.0 CS • 316L SS Clad with 316L SS Internals ASME VIII div 1 Yes Yes 002 232-K-1005 2nd Stage Offgas Compressor 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0003 Reciprocating (Note 3) 8158 Sm3/h 334 Note 3 65 In: 17.9 Out: 55.4 -25 / 150 In: 47.4 Out: 120 Note 3 Note 3 Vendor Specified API 618 37.5 bar differential. 002 232-CLR-1006 2nd Stage Offgas Compression Discharge Cooler 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0003 Air Cooler 605 25 89 (Bare Tube) FV / 65 54.7 -25 / 150 In: 120 Out: 60 1.8 x 7.3 6.0 316L SS tubes • header API 661 ASME VIII DIV 1 1 bays - 2 fans per bay. Total Fan duty = 12 kW 002 232-P-1007A/B Compressor Condensate Recycle Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0003 Positive Displacement 3.4 m3/h @ 15.0 bar diff. 1.8 3.0 25 In: 5.3 Out: 20.6 -25 / 100 74.3 1.0 CS API 676 002 NOTE: • Offgas Compressor Train is of 1 x 100% configuration. All equipment for Train B have been deleted in Rev 002 of this document. • Offgas Compressor may be packaged subject to size i.e. compressor (including gear box and driver) and scrubbers on a baseplate with control panel pre-wired and tested. • Two stages on a single shaft. Weight and installed power included in first stage. Weight includes baseplate and motor.. 002 PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 7 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 240 GAS TREATMENT Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location GAS TREATMENT Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 240-FCL-0501 Gas Treatment Filter Coalescer 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0004 Vertical Vessel 2.89 MSCMD FV /65 54.0 -25 / 85 49.5 0.74 ID x 5.0 T/T (Note 1) 13.7 316L SS with 316L SS internals (Note 2) ASME VIII Div 1 Yes Note 4 NOTE: • Vessel dimensions based on vendor information from Phase 1. To be confirmed with supplier during EPC. • CS Clad material may be used in lieu of solid CRA material. • Equipment Tag 240-DR-0502 (Mercury Removal Bed) and 240-FC-0503 (After-Filter for Mercury Removal Unit) have been deferred for procurement until further information regarding mercury content is fully assessed. Accordingly, these items have been deleted in the Rev 002 of this document. • HAZOP recommendation for a standby Filter Coalescer was not considered and 'Management of Change' to be issued by Company. 002 002 PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 8 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 250 GAS CONDITIONING (DEHYDRATION AND DEW POINTING) Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location GAS CONDITIONING (DEHYDRATION AND DEW POINTING) Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 250-HE-0701 Export Gas/ Sweet Gas Heat Exchanger 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0005 Hair Pin 2,024 856 (Note 2) FV / 65 Tube: 52.0 Shell: 48.7 -46 / 85 Tube: In= 55, Out= 30.0; Shell: In= 20.3, Out= 50 12 x 1.5 x 2.0 (Note 2) 30 Shell: LTCS • 3 mm CA Tubes: 316L SS Tubesheet: 316L SS Channel: 316L SS ASME VIII Div 1 / TEMA R Yes Combine with 250-HE-0706 on one skid. 250-FCL-0703 TEG Contactor Filter Coalescer 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0005 Vertical Vessel 2.86 MSCMD FV / 65 51.4 -25 / 85 30 1.8 ID x 5.3 T/T (Note 1) 25.0 CS with 316L Clad and 316L SS Internals ASME VIII Div 1 Yes Yes Note 1 002 250-C-0704 TEG Contactor 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0005 Structured Packing (Note 3, 4) FV / 65 51.1 -25 / 85 (Note 4) 30 1.35 ID x 8.5 T/T (Note 1) 20.0 Lower: CS • 316L SS Clad, Upper: CS • 3mm CA 316L SS Internals ASME VIII Div 1 Yes Yes The weight of column does not include internals 250-PK-0705 TEG Regeneration Package (comprising): 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-PFD-0005 Note 3 10.5 x 2.6 x 4.8 26 Vendor specified HOLD 4 250-CLR-0709 Lean Glycol Air Cooler 1 Air Cooler (Note 3) 40 11 20 (Bare Tube) 65 52 -5 / 100 In: 86 Out: 60 316L SS Header : Al finned tubes API RP661 & ASME VIII DIV I Part of TEG Regeneration Package 1 bay - 2 fans per bay. Total Fan duty = 5 kW Not installed on skid. 250-CND-0710 Glycol Regeneration Condenser 1 Reflux Coil (Note 3) 4 3.5 0.1 -5 / 135 100 316L SS API RP661 & ASME VIII DIV I Yes Part of TEG Regeneration Package. 250-HE-0711 Lean / Rich Glycol Heat Exchanger 1 Brown fin tube or plate & frame exchanger (Note 3) 200 16 10 (shell), 10 (tube) 0.2 (shell), 3.5 (tube) -5 / 235 (tube), -5 / 235 (shell) Tube: In:=35 Out = 150 Shell: In= 204 Out = 86 CS • 3 mm CA ASME VIII DIV I Yes Part of TEG Regeneration Package. 250-F-0712A/B Glycol Particle Filter 2 Cartridges, vertical, polypropylene elements (Note 3) 2,250 kg/h 10 3.5 -5 / 100 35 CS • 3 mm CA ASME VIII DIV I Yes Part of TEG Regeneration Package. 250-F-0713 Glycol Charcoal Filter 1 Charcoal, carbon elements (Note 3) 2,250 kg/h 10 4 -5 / 100 35 CS • 3 mm CA ASME VIII DIV I Yes Part of TEG Regeneration Package. 250-P-0714A/B Lean Glycol Pump 2 Fixed Stroke Reciprocating (Note 3) 2.0 m3/h 5 7.5 65 53 -5 / 140 86 CS API STD 674 Yes Part of TEG Regeneration Package. 250-C-0715 Regeneration Column 1 Random Packing (Note 3) 2,390 kg/h 3.5 0.3 -5 / 235 Bottom: 204 Top: 100.1 316L SS ASME VIII DIV I Yes Part of TEG Regeneration Package. 250-V-0716 Glycol Flash Drum 1 Horizontal three phase separator (Note 3) 10 4.2 -5 / 100 35.7 CS • 3 mm CA ASME VIII DIV I Yes Part of TEG Regeneration Package. 250-V-0717 Glycol Surge Drum 1 Horizontal vessel (Note 3) 3.5 0.3 -5 / 235 204 CS • 3 mm CA ASME VIII DIV I Yes Part of TEG Regeneration Package. 250-HE-0718 Glycol Reboiler 1 Electric Heater in Horizontal Vessel (Note 3) 145 180 3.5 0.3 -5 / 235 204 CS • 3 mm CA ASME VIII DIV I Yes Part of TEG Regeneration Package. Additional 20% duty for start up case. 250-HE-0706 Export Gas/ Dry Gas Heat Exchanger 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0006 Hair Pin 1039 283 FV / 65 Tube: 50.3 Shell: 49.2 -46 / 85 Tube: In= 31, Out= 17.7; Shell: In= 5.7, Out= 20.3 8.0 x 1.0 x 2.0 17 Shell: LTCS • 3 mm CA Tubes: LTCS Tubesheet: LTCS • 3mm CA Channel: LTCS • 3mm CA TEMA R ASME VIII DIV 1 Yes Combine with 250-HE-0701 on one skid. 250-HE-0707 Dry Gas Chiller 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0006 Shell & Tube Exchanger 1071 176 Tube: FV / 65 Shell: FV / 18 Tube: 49.8 Shell: 3.7 -46 / 85 Tube: In= 17.7, Out= 5.8; Shell: In= 0.0, Out= 1.5 0.8 ID x 8 T/T 6.5 Shell: LTCS • 3 mm CA Tubes: LTCS Tubesheet: LTCS • 3mm CA Channel: LTCS • 3mm CA TEMA R ASME VIII DIV 1 Yes 250-V-0708 Cold Separator 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0006 Vertical Vessel 2.8 MSCMD FV / 65 49.3 -46 / 85 5.8 1.7 ID x 3.2 T/T 15.0 LTCS • 3 mm CA with 316L SS Internals ASME VIII DIV 1 Yes Yes NOTE: • The TEG Contactor Filter Coalescer (250-FCL-0703) includes a 3-phase knock-out section at the bottom to separate water / amine and condensate streams from the cooled gas. Vessel dimensions to be confirmed with Supplier during EPC. Accordingly, Equipment Tag 250-KO-0702 (Sweet Gas KO Drum) has been deleted in Rev. 002 of this document. • Exchanger type, area and dimensions (pro-rated for revised duty) are based on vendor information from phase 1. • Package equipment and duties are typical. To be confirmed with supplier during EPC. • TEG Contactor will be supplied by the Regeneration Package supplier. Design temperature to be confirmed with supplier for failure of Lean Glycol Cooler. 002 002 PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 9 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 270 GAS EXPORT AND METERING Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location GAS EXPORT AND METERING Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 270-XX-1202 Export Gas Fiscal Metering Package 1 PROJECT1-FEED CONTRACTOR-OF02-E000-PR- PFD-0009 Includes On-line Gas Chromatograph and dew-point analyser 2.7 MSCMD 94 48.3 -25 / 85 50.2 9.0 (L) x 4.0 (W) 20.0 CS (Vendor Specified) AGA 9 NOTE: 1. Metering package details will be confirmed during EPC Phase. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 10 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 280 GAS SWEETENING (AMINE) Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location GAS SWEETENING (AMINE) Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 280-C-0601 Amine Absorber Column 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0004 Tray (HOLD 3) (Note 1, 2) 1.2 MSCMD FV / 65 54 -25 / 85 (Note 2) 68.9 1.3 ID x 20 T/T 35 CS with 316L SS Clad and 316L SS Internals ASME VIII Div 1 Yes Yes The weight of column does not include internals. 280-PK-0602 Amine Regeneration Package (comprising): 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0004 Note 1, 3 Two Skids: 1 - 14.0 (L) x 4.0 (W) 2 - 11.5 (L) x 2.5 (W) 35 HOLD 4 280-V-0603 Amine Regeneration Flash Drum 1 (Note 1) 33 m3/h 15.0 9.0 -5 / 85 60 Included in Package Skid CS with 316L SS Clad ASME VIII Div 1 Yes Part of Amine Regeneration Package 280-HE-0604 Amine Regeneration Lean / Rich Exchanger 1 Plate & Frame Type Exchanger (Note 1) 1,020 2,500 15.0 Rich: 9.0 Lean: 3.5 -5 / 150 Rich: 60 - 90 Lean: 110 - 82 Included in Package Skid 316L SS ASME VIII DIV I Yes Yes Part of Amine Regeneration Package 280-C-0605 Amine Regeneration Stripper Column 1 HOLD 2 (Note 1) 33 m3/h 5.0 1.0 -5 / 150 110 1.3 x 20.0 (ID x TT) (Free Standing) 11 CS with 316L SS Clad ASME VIII DIV I Yes Yes Part of Amine Regeneration Package 280-CLR-0606 Amine Regeneration Condenser 1 Air Cooler (Note 1) 100 8 30 (Bare Tube) 5.0 0.9 -5 / 150 In: 80 Out: 60 5.0 x 2.4 x 3.9 5 Duplex SS Header, 316 Tubes API 661 & ASME VIII DIV I Yes Yes Part of Amine Regeneration Package 1 bay - 2 fans per bay. Total Fan duty = 5.5 kW Induced draft type assumed. 280-V-0607 Amine Regeneration Condensate Drum 1 (Note 1) 5.0 0.7 -5 / 150 60 Included in Package Skid 316L SS ASME VIII DIV I Part of Amine Regeneration Package 280-P-0608A/B Amine Regeneration Reflux Pump 2 Positive Displacement (Note 1) 2.0 m3/h 0.8 1.5 5.0 0.8 -5 / 150 60 Included in Package Skid 316L SS API 676 Part of Amine Regeneration Package 280-P-0609A/B Amine Regeneration Lean Solution Booster Pump 2 Centrifugal (Note 1) 33 m3/h 11 15 5.0 3.5 -5 / 150 110 Included in Package Skid CS / 316L SS Impeller API 610 Yes Part of Amine Regeneration Package 280-CLR-0610 Amine Regeneration Lean Solution Cooler 1 Air Cooler (Note 1) 760 22 85 (Bare Tube) 5 3.5 -5 / 150 In: 82 Out: 60 3.0 x 9.0 x 4.0 11 316L SS API 661 ASME VIII DIV 1 Yes Part of Amine Regeneration Package 2 bays - 2 fans per bay. Total Fan duty = 13 kW Induced draft type assumed. 280-F-0611A/B Mechanical Filter 2 (Note 1) 33 m3/h 15.0 9.0 -5 / 85 60 Included in Package Skid CS ASME VIII DIV I Yes Part of Amine Regeneration Package 280-F-0612A/B Carbon Filter 2 (Note 1) 6 m3/h 5 3.5 -5 / 150 60 Included in Package Skid CS ASME VIII DIV I Yes Part of Amine Regeneration Package 280-F-0613A/B Mechanical Filter 2 (Note 1) 6 m3/h 5 3.5 -5 / 150 60 Included in Package Skid CS ASME VIII DIV I Yes Part of Amine Regeneration Package 280-P-0614A/B Amine Regeneration Lean Solution Pump 2 Centrifugal (Note 1) 33 m3/h 65 90 65 56.0 -5 / 85 60 Included in Package Skid CS / 316L SS Impeller API 610 Part of Amine Regeneration Package 280-HE-0615 Amine Regeneration Reboiler 1 Shell & tube (kettle) (Note 1) 1,500 160 5.0 1.2 -5 / 150 110 Included in Package Skid CS + 3mm CA 316L SS Tubes TEMA R ASME VIII DIV 1 Yes Part of Amine Regeneration Package. Heating Medium supply to reboiler. NOTE: • Package equipment and duties are typical. To be confirmed with supplier during EPC. • Amine Absorber Column will be supplied by the Amine Regeneration package supplier. Design temperature to be confirmed with supplier for failure of lean amine cooler. • Automated sampling and analysis of amine solution to be provided utilising mass spectrometry type analytical system. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 11 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 310 CONDENSATE EXPORT LINE Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location CONDENSATE EXPORT LINE Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 310-PLR-1601 Export Condensate Pig Launcher 1 PROJECT1-FEED CONTRACTOR-OF02-E000-PR- PFD-0010 94 Current: 41 Future: 82 (Note 3) -25 / 85 60 Diameter (Minor/Major Barrel): 6"/10.75" NB Length: 5.8 m 1.00 CS • 3mm CA ASME B31.4/ ASME VIII Div 1 310-PL-1602 Export Condensate Pipeline 1 PROJECT1-FEED CONTRACTOR-OF02-E000-PR- PFD-0010 10,000 SBPD (Note 1) 94 Current: 41 Future: 82 (Note 3) -25 / 85 60 11.7 km & 6" NB (7.11 mm thickness) 340 CS API 5L X52• 3 mm CA Externally coated. ASME B31.4 / NT 109.02 310-PLR-1603 Export Condensate Pig Receiver 1 PROJECT1-FEED CONTRACTOR-OF02-E000-PR- PFD-0010 Note 2 94 72 (Note 3) -25 / 85 46 Diameter (Minor/Major Barrel): 6"/10.75" NB Length: 8.5m 1.00 CS • 3mm CA ASME B31.4/ ASME VIII Div 1 310-PIT-1604 Export Condensate Drain Sump 1 Note 2 ATM ATM -5 / 85 AMB 1.0 x 1.0 x 1.0 Lined Concrete 310-PNL-1605 PROJECT Z Solar Power System 1 Note 2, 4 0.4 5.0 x 4.0 x 3.0 0.8 Vendor Standard API 554 NOTE: • The Export Condensate Pipeline is designed for 10,000 SBPD; the design margin in the capacity enables to bring down the storage inventory after a PROJECT Z shutdown. • Equipment located near tie-in with PROJECT Z facilities. • Operating pressure depends on throughput of PROJECT Z pipeline. Currently PROJECT Z is operating a relatively low capacity and export pipeline operating pressure is consequently lower. • PROJECT Z electrical load shall be optimised in order to reduce the power consumption and reduce the size of the Solar Panel during the EPC Phase. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 12 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 320 GAS EXPORT LINE Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location GAS EXPORT LINE Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY Package Notes Capacity Duty kW Instal. Power kW PFD No.(each) Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 320-PLR-1101 Export Gas Pig Launcher 1 PROJECT1-FEED CONTRACTOR-OF02-E000-PR- PFD-0009 94 46.4 -25 / 85 49.4 Diameter (Minor/Major Barrel): 24' /30' NB Length: 7.2m 2.70 CS + 3mm CA ASME B31.8/ ASME VIII Div 1 320-PL-1102 Export Gas Pipeline 1 PROJECT1-FEED CONTRACTOR-OF02-E000-PR- PFD-0009 2.7 MSCMD 94 46.4 -25 / 85 49.4 51.8 km x 24' (9.53mm thickness) 7310 CS API 5L X65 + 1.5 mm CA ASME B31.8 Future injection pressure at Location Z Receiving Station is 70barg. External 3 layer PE coating (3mm thick). 320-XX-1103 Export Gas Pipeline Block Valve Station 1 PROJECT1-FEED CONTRACTOR-OF02-E000-PR-PFD-0009 94 46.4 -25 / 85 49.4 4.5 Vendor Standard ASME B31.8 24' NB Block Valve. 320-PLR-1104 Export Gas Pig Receiver 1 PROJECT1-FEED CONTRACTOR-OF02-E000-PR- PFD-0009 94 46.4 -25 / 85 49.4 Diameter (Minor/Major Barrel): 24' /30' NB Length: 10.6m 2.7 CS + 3mm CA ASME B31.8/ ASME VIII Div 1 320-PNL-1105 Block Valve Station Solar Power System 1 Note 1 0.4 5.0 x 4.0 x 3.0 0.8 Vendor Standard API 554 320-PIT-1106 Export Gas Drain Sump 1 ATM ATM -5 / 85 AMB 1.0 x 1.0 x 1.0 Lined Concrete 320-PNL-1107 HRS Solar Power System 1 Note 1 0.4 5.0 x 4.0 x 3.0 0.8 Vendor Standard API 554 NOTE: 1. HRS and Block Valve Station electrical loads shall be optimised in order to reduce the power consumption and reduce the size of the Solar Panel during the EPC Phase. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 13 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 330 CONDENSATE STORAGE AND METERING Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location CONDENSATE STORAGE AND METERING Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper CS + 3 mm CA 330-TK-1501 Condensate Storage Tank 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0008 1600 m3 (Note 3, 5) 0.17 ATM -5 / 85 60 15.0 ID x 12.6 H 100 with non-metallic internal lining API 650 CS + 3 mm CA 330-TK-1502 Condensate Storage Tank 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0008 1600 m3 (Note 3, 5) 0.17 ATM -5 / 85 60 15.0 ID x 12.6 H 100 with non-metallic internal lining API 650 Case: Cast Iron Note 1 Vertical Multistage 33 m3/h @ 40.3 bar Impeller: Cast 330-P-1504A/B Condensate Export Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0008 Can Type Centrifugal Pump dp (Note 1) 62 75 94 40 -5 / 85 63 3.4 each Iron API 610 Material Designation I-1 API 610 2 x 50% pumps. In future, the pumps may operate with a dp of 82 bar and may require revamping or replacement. 002 Case: Cast Iron Vertical Multistage Impeller: Cast 330-P-1505A/B Condensate Recycle Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0008 Can Type Centrifugal Pump 16.6 m3/h @ 20.5 bar dp 21 30 28 20.5 -5 / 85 60.8 1.7 Iron API 610 Material API 610 Electric Driven. 2x100% pumps. 002 Designation I-1 CS + 3 mm CA 330-XX-1507 Condensate Metering Package 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0008 66 m3/h (Note 1) 94 82.1 -5 / 85 63 2.0 (Vendor specified) LACT unit. (Note 6) NOTE: • Each Condensate Export Pump capacity corresponds to a nominal production rate of 5000 SBPD. Both export pumps may need to be in operation to bring down the storage inventory after a PROJECT Z shutdown. 002 • Condensate Recycle Pump is designed for turndown and reprocessing requirements. 002 • Condensate storage tanks: Each tank has 2 days storage capacity corresponding to a nominal production rate of 5000 SBPD. • Equipment items 330-TK-1503 (Offspec Condensate Storage Tank), 330-P-1506 (Offspec Condensate Recycle Pump) and 330-P-1504C (Future Condensate Export Pump) have been deleted in Rev. 002 of this document. 002 • Condensate storage tanks: Specified capacity is the net required storage capacity. Tank dimensions include margins for ullage and dead volume and are based on API 650 typical size. • LACT Unit comprises coriolis mass flow meter, with RVP analyser, BS&W monitor and density measurement. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 14 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 360 WELL FLOWLINES Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location WELL FLOWLINES Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper Diameter (minor/major ASME VIII DIV 1 / 360-PLR-0201 Mobile Pig Launcher 1 Note 1 FV / 94 -25 / 85 barrel): 6 /10.75 NB 2.0 CS + 3mm CA Packaged item B31.8 Length = 5.8m Diameter (minor/major ASME VIII DIV 1 / 360-PLR-0202 Mobile Pig Receiver 1 Note 1 FV / 94 -25 / 85 barrel): 6 /10.75 NB 2.0 CS + 3mm CA Packaged item B31.8 Length = 8.5m 360-PL-0210 Wellhead flowline 1 PROJECT1-FEED CONTRACTOR-OF01-E000-PR- 94 61 -25 / 85 50 7.5 km & 6 NB 220 CS API 5L X52 + 3mm CA ASME B31.8 / Well 2-1. Notes 4, 7 PFD-0011 NT109.01 360-PL-0211 Wellhead flowline 1 PROJECT1-FEED CONTRACTOR-OF01-E000-PR- 94 59 -25 / 85 50 7.4 km & 6 NB 220 CS API 5L X52 + 3mm CA ASME B31.8 / Well 2-2. Notes 4, 7 PFD-0011 NT109.01 360-PL-0212 Wellhead flowline 1 PROJECT1-FEED CONTRACTOR-OF01-E000-PR- 94 62 -25 / 85 50 6.3 km & 6 NB 185 CS API 5L X52 + 3mm CA ASME B31.8 / Well 5-1. Notes 4, 7 PFD-0011 NT109.01 360-PL-0213 Wellhead flowline 1 PROJECT1-FEED CONTRACTOR-OF01-E000-PR- 94 68 -25 / 85 50 20.0 km & 6 NB 580 CS API 5L X52 + 3mm CA ASME B31.8 / Well 6-1. Notes 4, 7 PFD-0011 NT109.01 360-PL-0214 Wellhead flowline 1 PROJECT1-FEED CONTRACTOR-OF01-E000-PR- 94 82 -25 / 85 50 20.5 km & 6 NB 590 CS API 5L X52 + 3mm CA ASME B31.8 / Well 4-1. Notes 4, 7 PFD-0011 NT109.01 360-PL-0215 Wellhead flowline 1 PROJECT1-FEED CONTRACTOR-OF01-E000-PR- 94 73 -25 / 85 50 13.0 km & 6 NB 380 CS API 5L X52 + 3mm CA ASME B31.8 / Well 3-1. Notes 4, 7 PFD-0011 NT109.01 360-PL-0216 Wellhead flowline 1 PROJECT1-FEED CONTRACTOR-OF01-E000-PR- 94 59 -25 / 85 50 3.4 km & 6 NB 120 CS API 5L X52 + 3mm CA ASME B31.8 / Well 1-1. Notes 4, 7 PFD-0011 NT109.01 360-PL-0217 Wellhead flowline 1 PROJECT1-FEED CONTRACTOR-OF01-E000-PR- 94 58 -25 / 85 50 1.5 km & 6 NB 50 CS API 5L X52 + 3mm CA ASME B31.8 / Project1-1. Notes 4, 7 002 PFD-0011 NT109.01 360-PL-0218 Methanol Line for Project1 1 PROJECT1-FEED CONTRACTOR-OF01-E000-PR- 383 Approx. -5 / 85 50 1.5km & 2 NB 17 CS API 5L X52 + 3mm CA ASME B36.10 Note 5, 8 PFD-0011 280 B31.4/ NT 109.02 360-PL-0219 Methanol Line for Well 2 1/2 1 PROJECT1-FEED CONTRACTOR-OF01-E000-PR- 383 Approx. -5 / 85 50 10.54km & 2 NB 120 CS API 5L X52 + 3mm CA ASME B36.10 Note 5, 8 PFD-0011 280 B31.4/ NT 109.02 360-PL-0220 Methanol Line for Well 4 / Well 3 / Well 5 1 PROJECT1-FEED CONTRACTOR-OF01-E000-PR- 383 Approx. -5 / 85 50 24.19km & 2 NB 270 CS API 5L X52 + 3mm CA ASME B36.10 Note 5, 8 PFD-0011 280 B31.4/ NT 109.02 360-PL-0221 Methanol Line for Well 6 / Well 1 1 PROJECT1-FEED CONTRACTOR-OF01-E000-PR- 383 Approx. -5 / 85 50 19.75km & 2 NB 220 CS API 5L X52 + 3mm CA ASME B36.10 Note 5, 8 PFD-0011 280 B31.4/ NT 109.02 NOTE: • One portable skid mounted Mobile pig launcher and Mobile pig receiver common for all wells. Dimensions based on typical supplier information. • Deleted. 002 • All flowlines to be buried and provided with an external 3 layer PE coating (3 mm thk). • Flowline wall thickness is 7.11mm for all flowlines. Corrosion allowance for flowline specified at 3mm by COMPANY Laboratory in Country2 (FEED Contractor recommendation is for 6mm CA). 002 • Methanol lines from FACILITY to Wellheads are routed along the flowlines in trenches. Methanol line thickness: 8.74mm. • All Wellheads shall be provided with PSVs including vent stacks. This is for over-pressure protection of the flowlines (Technical Note - Flowline Pressure Protection; PROJECT1-FEED CONTRACTOR-MUL-0000-PR-TNO-0001). 002 • Pipeline depressuring rate shall confirm the minimum design temperature of the pipelines. • The methanol injection line to the wellheads are represented by lines 2 -XA-360-GGG-25CH3M on P&ID PROJECT1-FEED CONTRACTOR-OF01-E360-PR-PID-0001. See also notes 2, 3 and 4 on the same P&ID. • Equipment tags 360-KO-0203 to 0209 (Flowline Relief Knock Out Drums) have been deleted in Rev. 002 of this document. 002 PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 15 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 400 COOLING MEDIUM Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location COOLING MEDIUM Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 400-PK-1901 Refrigeration Package (comprising): 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0009 Note 1, 2 1071 (thermal) HOLD 4 400-RCV-1903 Refrigerant Receiver Drum 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0009 5.3 m HOLD 4 20.3 HOLD 4 60 1.5 ID x 4.5 T/T 7.0 Vendor Specified ASME VIII Div 1 Yes Part of Refrigeration Package. 400-KO-1904 Suction Drum 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0009 HOLD 4 3.5 HOLD 4 1.5 1.3 D x 2.6 T/T 3.5 Vendor Specified ASME VIII Div 1 Yes Part of Refrigeration Package. 400-CLR-1905 Condenser (Air Cooler) 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0009 Air Cooler 1,604 60 HOLD 4 21.0 HOLD 4 In: 81 Out: 60 12.5 x 4.8 x 5.0 20.0 Vendor Specified ASME VIII DIV 1 API 661 Part of Refrigeration Package. 1 Bay - 2 Fans. Fan duty = 41 kW 400-K-1906 Refrigerant Compressor 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0009 Screw 532 640 HOLD 4 In: 3.4 Out: 21 HOLD 4 In: 1.1 Out: 81 20.0 Vendor Specified API 619 Yes Note 4 Part of Refrigeration Package. 1 x 100% compressor. 002 400-PK-1902 Refrigeration Storage Vessel Package 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0009 Note 3 7.5 m 18 -25 / 85 1.37 OD x 4.7 T/T 2.0 Vendor Specified ASME VIII Div 1 HOLD 4 NOTE: • Package equipment and duties are based on vendor information in Phase 1. To be confirmed with supplier in EPC. • Refrigeration based on propane refrigerant. • Tote tank containing refrigerant will be delivered to Site and held in-place on a permanent basis to replenish the system inventory in case of losses. Propane inventory required is approximately 3.5 te. Dimension shown above is for typical 2000 US gallon propane tote tank. • Space and Tie-ins shall be provided within the package unit for future installation of a spare compressor. 002 PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 16 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 410 HEATING MEDIUM Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location HEATING MEDIUM Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 410-PK-1801 Heating Medium Package (comprising): 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0008 Notes 1, 2 HOLD 4 410-EX-1802 Heating Medium Expansion Drum 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0008 Note 1 4 m3 15 3.5 -5 / 235 135 1.3 ID x 3.9 T/T 1.0 Vendor Specified ASME VIII Div 1 Yes Part of Heating Medium Package 410-P-1803A/B Heating Medium Circulation Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0008 Centrifugal (Note 1) 263 m3/h each @ 7 bar dp 85 each 115 15 10 -5 / 235 135 2.0 Vendor Specified API 610 Yes Part of Heating Medium Package 410-F-1804 Heating Medium Filter 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0008 Note 1 15 10 -5 / 235 135 0.5 Vendor Specified ASME VIII DIV 1 Yes Part of Heating Medium Package 410-FH-1805 Heating Medium Fired Heater 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0008 Note 1 6,100 15 10 -5 / 235 220 5.0 OD x 14 H 27.0 Vendor Specified API 560 / 530 Yes Part of Heating Medium Package 410-CLR-1806 Heating Medium Dump Cooler 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0008 Air Cooler (Note 1) 2,133 37 142 (Bare) 15 8.5 -5 / 235 185 2.5 x 4.6 7.3 Vendor Specified API 661 Part of Heating Medium Package 2 bays - 2 fans per bay. Total Fan duty = 18 kW 410-V-1807 Heating Medium Drain Vessel 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0008 35 m3 3.5 0.05 -5 / 185 135 2.6 ID x 7.5 T/T 8.1 CS + 3mm CA Externally Coated ASME VIII Div 1 410-P-1808A/B Heating Medium Drain Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0008 5 m3/h @ 8 bar dp 2.8 4.0 13 8.5 -5 / 185 135 1.0 CS case with CS impeller. API 610 material designation S-9 API 610 NOTE: • Package equipment and duties are typical. To be confirmed with supplier during EPC. The Heating Medium Package shall comprise several skids. • The heating medium system comprises two temperature levels of hot oil supply to consumers: Heating medium temperature to Condensate Stabilisation Reboiler and Inlet Heater will be 220°C; while that to Amine Regeneration Reboiler will be 160°C. Typical controls within the package unit are shown in the UFD, which should be confirmed by supplier in EPC. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 17 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 420 CHEMICAL INJECTION Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location CHEMICAL INJECTION Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 420-PK-2801 Chemical Injection Package (Process) 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- Approx. Approx. 65 55.0 -5 / 85 50 3.0 x 4.0 x 3.0 16.0 SS (Vendor API 675 Notes 1, 2, 5 UFD-0006 1 2 Specified) 420-PK-2802 Chemical Injection Package (Produced Water) 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- Approx. Approx. 10 3.0 -5 / 85 50 3.0 x 3.0 x 2.0 10.0 SS (Vendor API 675 Notes 3, 4, 5 UFD-0006 1 2 Specified) NOTE: 1. The injection chemicals for process typically are corrosion inhibitor, anti-foam, scale inhibitor, demulsifier etc 2. The Chemical Injection Package for process comprises of (HOLD 4): • Multicompartmented tank (4 compartments) • Dosing pumps - Multihead dosing pumps (2 x 100%) with 2 heads each are required for Antifoam injection; - Multihead dosing pumps (3 x 50% - 2 operating + 1 standby) with 4 heads each are required for Corrosion Inhibitor. The same applies to Scale Inhibitor injection, if required. - 2 x 100% dosing pumps for Demulsifier • Mixers (one per compartment) 3. The injection chemicals for produced water are corrosion inhibitor, reverse demulsifier, biocide, etc. 4. The Chemical Injection Package for Produced Water system comprises of (HOLD 4): • Multicompartmented tank (3 compartments) • Dosing pumps (3 operating + 3 standby) • Mixers (3; one per compartment) 5. For details, refer Chemical Injection Packages datasheet (PROJECT1-FEED CONTRACTOR-PF01-E420-PR-DAT-0028) PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 18 of 35 Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location FLARE Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE EQUIPMENT LIST DETAILS SYSTEM CODE: 430 FLARE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 430-VD-1701 HP Flare KO Drum 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0003 Gas: 104427 kg/h (2.8 MSCMD) Liquid: Liquid: 45352 kg/h (57 m3/h) FV / 10 4.0 -46 / 160 50 2.8 ID x 6.5 T/T 12.0 CS • 3mm CA with non-metallic internal lining ASME VIII Div 1 Yes 430-P-1702A/B HP Flare KO Drum Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0003 Centrifugal 24.2 m3/h @ 2.5 bar dp 2.9 5.5 15 2.9 -5 / 85 50 1.0 Case: CS Impeller: CS API 610 Material Designation S-5 API 610 430-SK-1703 HP Flare Stack 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0003 Package Unit (Note 2) Gas: 104427 kg/h (2.8 MSCMD) (Note 1) 10 3.2 -46 / 160 50 Flare stack diameter 18"; Flare tip diameter 16"; Stack ht - 35m (Note 1) 16.0 Vendor Specified API 537 / API 521 430-BIG-1704 Ignition Package 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0003 Package Unit (Note 3) 0.7 Vendor Specified Common for HP and LP Flare 430-VD-1705 LP Flare KO Drum 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0004 Gas: 32030 kg/h (0.34 MSCMD) Liquid: 9354 kg/h (9.4 m3/h) FV / 3.5 0.3 -5 / 210 50 1.8 ID x 5.0 T/T 4.0 CS • 3mm CA with non-metallic internal lining ASME VIII Div 1 430-P-1706A/B LP Flare KO Drum Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0004 Centrifugal 5.5 m3/h @ 2.7 bar dp 1.3 2.2 8 3.2 -5 / 85 50 1.0 Case: CS Impeller: CS API 610 Material Designation S-5 API 610 430-SK-1707 LP Flare Stack 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0003 Package Unit (Note 2) Gas: 32030 kg/h (0.34 MSCMD) (Note 1) 3.5 0.15 -5 / 210 50 Flare stack diameter 16"; Flare tip diameter 16" ; Stack ht - 26m (Note 1) 15.0 Vendor Specified API 537 / API 521 430-SK-1708 CO2 Vent Stack 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0003 Package Unit 1814 kg/h (25544 SCMD) 3.5 0.2 -5 / 150 54 6" vent Stack ht - 20m 2.0 Vendor Specified 430-EH-1709 HP Flare KO Drum Heater 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0003 Electric Heater 40 10.0 -46 / 160 0.5 Element: 316L SS 430-EH-1710 LP Flare KO Drum Heater 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0004 Electric Heater 15 3.5 -5 / 210 0.3 Element: 316L SS NOTE: • HP and LP Flare System capacity and equipment sizes to be confirmed during EPC phase after a Flare and Blowdown Study. • HP and LP Flare Stack packages typically include: - Flare Tip Assembly - Flare Stack and Pilot Gas Riser - Seal - Pilot Gas System - Pilot Gas Back-Up (Propane) • Redundant Ignition and Monitoring Systems required. One of the ignition sources shall be electronic flare ignition type. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 19 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 440 PRODUCED WATER TREATMENT Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location PRODUCED WATER TREATMENT Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 440-V-1301 Produced Water Flash Drum 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-PFD-0007 Horizontal Vessel 10.2 m3/h FV / 5 1.0 -25 / 85 50 1.2 ID x 3.5 T/T 2.8 CS + 3mm CA ; non-metallic Internal lining ASME VIII Div I 440-P-1302 A/B Produced Water Feed Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0007 Centrifugal 10.2 m3/h @ 3 bar dp 1.8 3.0 10 4 -5 / 85 50 1.7 Case: DSS Impeller: DSS API 610 Material Class D1 or D2 API 610 Electric Drive Motor. 440-PK-1303 Produced Water Treatment Package 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0007 Note 3 10.2 m3/h 10 10 Vendor Specified HOLD 4 002 440-PIT-1304A/B Evaporation Pond 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0007 -5 / 85 50 120 x 120 x 1.5 Geo-Textile Lined Evaporation Ponds to be internally lined with Geo-Textile Membrane. 440-PK-1305A/B Oil Skimmer Package 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-PFD-0007 2 One for each Evaporation Pond. HOLD 4. 440-PIT-1306 Offspec Water Pit 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- PFD-0007 -5 / 85 50 10 x 10 x 1.5 Geo-Textile Lined To be internally lined with Geo-Textile Membrane NOTE: • Produced Water unit capacity based on produced water flow rate of approximately 7 m3/h (Note 2) and a design margin for processing oily water from open drains system and water draw-off from Condensate Stabilisation Column. • Produced Water flow rate of 7 m3/h is pro-rated from the Rich Winter Heat and Material Balance to correspond to 7,000 SBPD condensate product from FACILITY. • The Produced Water Treatment Package typically includes a CPI Separator and an Oil Transfer Pump. Space and tie-ins shall be provided within the package for future installation of secondary treatment, e.g. Induced Gas Flotation (IGF) Unit. 002 PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 20 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 450 FUEL GAS Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location FUEL GAS Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 450-EH-2401 Fuel Gas Heater 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0014 Electrical 80 FV / 35 30 -25 / 85 30 - 70 0.8 CS + 3 mm CA Element: CS 002 450-KO-2402 HP Fuel Gas KO Drum 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0014 0.12 MSCMD FV / 35 30 -25 / 85 30 - 70 0.8 ID x 2.4 T/T 2.5 CS + 3 mm CA 316L SS internals ASME VIII Div 1 Yes 002 450-F-2403A/B Fuel Gas Filter / Separator 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0014 0.12 MSCMD FV / 35 30 -25 / 85 30 - 70 0.6 x 1.5 1.0 CS + 3 mm CA 316L SS internals ASME VIII Div 1 Yes 002 450-KO-2404 LP Fuel Gas KO Drum 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0014 0.06 MSCMD FV / 10 5 -25 / 85 30 - 70 0.8 ID x 2.4 T/T 2.0 CS + 3 mm CA 316L SS internals ASME VIII Div 1 Yes 002 NOTE: PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 21 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 460 METHANOL INJECTION Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location METHANOL INJECTION Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 460-P-2901 Methanol Offloading Pump 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0006 Centrifugal 10 m3/h @ 3 bar dp 2.8 4.0 7 3 -5 / 85 50 1.0 Case: CS, Impeller: CS API 610 Material Designation S-4 API 610 460-TK-2902 Methanol Storage Tank 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0006 150 m3 0.05 ATM -5 / 85 50 6.0 ID x 7.2 H 18.0 CS + 3mm CA with no- metallic internal lining API 650 Yes Note 1 460-P-2903A/B Methanol Distribution Pumps For FACILITY 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0006 Metering Pump 0.82 m3/h @ 58 bar dp 3 5.0 65 58 -5 / 85 50 1.0 Case: CS, Impeller: CS API 610 Material Designation S-4 API 675 HOLD 3 - Capacity 460-P-2904A/B Methanol Distribution Pumps For Wellheads 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0006 Diaphragm Pump 3.1 m3/h @ 320 bar dp 49 60 383 320 -5 / 85 50 1.0 Case: CS, Impeller: CS API 610 Material Designation S-4 API 675 Note 1 NOTE: • Methanol tank capacity based on one week's capacity considering an ambient soil temperature of 16°C. Wellhead distribution pump capacity based on maximum requirement considering an ambient soil temperature of 10°C. • Methanol supply and unloading requirements to be confirmed in EPC phase. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 22 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 470 CHLORINATION Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location CHLORINATION Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 470-PK-2601 Chlorination Unit 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0015 Note 1 Note 2 12 8 -5 / 85 50 2.0 x 2.0 x 3.0 2.0 Titanium / CPVC Vendor to confirm material selection NOTE: • The Chlorination Package comprises chemical tank with mixer and dosing pumps. • Chlorination unit capacity suitable for treatment of 30 m3/h Aquifer Water. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 23 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 480 UTILITY MISCELLANEOUS Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location UTILITY MISCELLANEOUS Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 480-TK-0801 Amine Storage Tank 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0001 29 m3 0.05 ATM -5 / 85 50 3.35 m OD x 4.6 m H 4.5 CS • 3mm CA with non- metallic internal lining. System 5 up to 1m from tank bottom API 12F 480-A-0802 Amine Storage Tank Mixer 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0001 5.5 0.2 316L SS 480-P-0803A/B Amine Transfer Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0001 Centrifugal 5 m3/h @ 6 bar dp 2.1 3.0 10 6 -5 / 85 50 1.0 Case: 316L SS, Impeller: 316L SS API 610 material designation S-9 API 610 480-EH-0804 Amine Storage Tank Heater 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0001 Electric 10.0 Element: 316L SS 480-V-0805 Amine Drain Vessel 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0001 Horizontal Vessel 15 m3 FV / 3.5 0.01 -5 / 85 50 2.2 x 6.0 (ID x TT) 5.5 CS • 3 mm CA External lining and CP ASME VIII Div 1 480-P-0806A/B Amine Drain Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0001 Sump Pump 5 m3/h @ 5 bar dp 1.7 3.0 10 5 -5 / 85 50 0.7 Case: 316L SS, Impeller: 316L SS API 610 material designation S-9 API 610 480-EH-0807 Amine Drain Vessel Heater 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0001 Electric 5.0 3.5 0.2 Element: 316L SS 480-TK-0808 Glycol Storage Tank 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0002 15 m3 0.05 ATM -5 / 85 50 2.93 OD x 3.65 H 3.5 CS • 3mm CA API 12F 480-P-0809A/B Glycol Transfer Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0002 Centrifugal 3 m3/h @ 6 bar dp 1.2 3.0 11 6 -5 / 85 50 1 Case: 316L SS, Impeller: 316L SS API 610 material designation S-9 API 610 480-EH-0810 Glycol Storage Tank Heater 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0002 Electric 10.0 0.2 Element: 316L SS 480-V-0811 Glycol Drain Vessel 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0002 Horizontal Vessel 10 m3 FV / 3.5 0.01 -5 / 85 50 1.9 x 6.0 (ID x TT) 4.5 CS • 3 mm CA External lining and CP ASME VIII Div 1 480-P-0812A/B Glycol Drain Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0002 Centrifugal 5 m3/h @ 5 bar dp 1.7 3.0 11 5 -5 / 85 50 1.00 Case: 316L SS, Impeller: 316L SS API 610 material designation S-9 API 610 480-EH-0813 Glycol Drain Vessel Heater 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0002 Electric 5.0 3.5 0.20 Element: 316L SS NOTE: PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 24 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 500 AQUIFER / PLANT WATER Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location AQUIFER / PLANT WATER Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 500-F-2601A/B Aquifer Water Filter 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0015 30 m3/h 12 8 -5 / 85 50 0.5 CS + Rubber lining ASME VIII Div 1 500-TK-2602A/B Plant Water Storage Tank 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0015 Note 1 115 m3 ATM ATM -5 / 85 50 4.7 OD x 7.3 H 10 CS + 3mm CA with non-metallic lining API 12F 500-P-2603A/B Plant Water Transfer Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0015 32 m3/h @ 8.5 bar dp 15.0 20.0 12 8 -5 / 85 50 1.0 Case: 316L SS, Impeller: 316L SS ISO 5199 / ASME B73.1 NOTE: 1. Plant water capacity quoted is nominal capacity corresponding to two days storage of normal requirement of plant water (includes requirements for production of fresh water and demin water) and make-up for fire water. See also Note 1 on Page 26. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 25 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 530 FRESH/POTABLE/DEMINERALISED WATER Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location FRESH/POTABLE/DEMINERALISED WATER Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 530-PK-3101 Fresh Water RO Treatment Package 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0015 1.75 m3/h 5.0 8 5.0 -5 / 85 50 5.0 316L SS (Vendor Specified) HOLD 4 530-TK-3102A/B Fresh Water Storage Tank 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0015 50 m3 each ATM ATM -5 / 85 50 3.66 OD x 6.1 H 7.0 CS + 3mm CA with non-metallic lining API 12F 530-P-3103A/B Fresh Water Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0015 35 m3/h @ 5.5 bar dp 10.5 15.0 8 5.7 -5 / 85 50 1.0 Case: 316L SS, Impeller: 316L SS ISO 5199 / ASME B73.1 530-PK-3104 Demin Water Polishing Package 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0015 0.5 m3/h 5.0 8 3 -5 / 85 50 1.0 Vendor specified ISO 5199 / ASME B73.1 HOLD 4 530-TK-3105 Demin Water Storage Tank 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0015 45 m3 0.05 ATM -5 / 85 50 3.66 OD x 6.1 H 7.0 CS + 3mm CA with non-metallic lining API 12F 530-P-3106A/B Demin Water Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0015 1.6 m3/h @ 4.7 bar dp 1.0 2.2 8 4.7 -5 / 85 50 1.0 Case: 316L SS, Impeller: 316L SS ISO 5199 / ASME B73.1 530-PK-3107 Chemical Dosing Package 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0015 Note 3 8 5 -5 / 85 50 12.0 316L SS (Vendor Specified) API 675 Note 2 NOTE: • Fresh water and demin water storage capacity quoted is required working volume corresponding to seven days storage of their normal requirements. • Chemicals for water treatment typically are biocide and regeneration chemicals for Demineralisation Unit. • Chemical Dosing Package comprises (HOLD 4): - Multi-compartmented Tank (3 compartments) - Dosing Pump (3 operating + 3 standby) - Mixers (3; one per compartment) PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 26 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 560 OPEN DRAINS Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location OPEN DRAINS Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 560-PIT-3001 Open Drains Sump 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0005 NOTE 1 ATM ATM -5 / 85 50 4.0 x 4.0 x 2.5 Lined Concrete 560-P-3002A/B Open Drains Sump Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0005 2 m3/h @ 3.0 bar dp 0.5 1.1 8.0 3.0 -5 / 85 50 1.0 Case: UNS S31803 Impeller: UNS S3183 API 610 Material Designation D1 560-A-3003 Open Drain Oil Skimmer Package 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0005 Vendor Specified Located within Open Drains Sump NOTE: 1. The Open Drains Sump is designed to handle a maximum drainage volume of 5 m3 in one day at a maximum rate of 15 m3/h. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 27 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 570 CLOSED DRAINS Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location CLOSED DRAINS Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 570-V-2101 Closed Drains Vessel 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0005 32 m3 3.5 0.1 -5 / 85 50 2.7 ID x 8.5 T/T 8.7 Shell: CS + 3mm CA with non-metallic lining, external coating and CP ASME VIII Div 1 Internal Lining (Epoxy Coating) Located in a Concrete Pit 570-P-2102A/B Closed Drains Transfer Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0005 Centrifugal 5 m3/h @ 22 bar dp 10.0 14.0 31 22.0 -5 / 85 50 0.6 Case: UNS S31803 Impeller: UNS S3183 API 610 Material Designation D1 API 610 570-EH-2103 Closed Drains Vessel Heater 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0005 Electric 40 3.5 -5 / 85 Element: 316L SS NOTE: PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 28 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 620 DIESEL OIL Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location DIESEL OIL Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 620-TK-2001 Diesel Storage Tank 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0011 60 m3 0.05 ATM -5 / 85 50 4.7 OD x 4.9 H 9.0 CS + 3mm CA with non-metallic internal lining at bottom of tank API 12F Capacity based on 3 days storage at maximum diesel consumption. 620-P-2002A/B Diesel Transfer Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0011 5 m3/h @ 2.5 bar dp 1.0 2.2 7 4.0 -5 / 85 50 1.0 Case: CS Impeller: Cast iron API 610 material designation S-1 API 610 620-FC-2003 Diesel Filter 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0011 5 m3/h 7 4.0 -5 / 85 50 1.0 CS + 3mm CA with non-metallic internal lining NOTE: PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 29 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 630 INSTRUMENT AND PLANT AIR Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location INSTRUMENT AND PLANT AIR Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °CMaterials Size L x W x H m Weight (each) tonnes Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 630-K-2201A/B Air Compressor 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0012 Oil-free Screw type 760 Sm3/h 111 132 12 10.0 -5 / 85 50 4 CS (Vendor specified) API 619 / ISO10440 Note 1, HOLD 4 002 630-VL-2202 Plant Air Receiver 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0012 15 m3 12 10.0 -5 / 85 50 1.8 ID x 5.4 T/T 6 Shell: CS + 3mm CA with non-metallic internal lining ASME VIII Div 1 002 630-PK-2203A/B Air Drier Package 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0012 Each comprises two towers. 660 Sm3/h 12 9.5 -5 / 85 50 5 Vendor Specified ASME VIII Div 1 Capacity quoted is instrument (dry) air flow rate. Note 1, HOLD 4 002 630-VL-2204 Instrument Air Receiver 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0012 40 m3 12 9.0 -5 / 85 50 2.5 ID x 7.3 T/T 11 Shell: CS + 3mm CA with non-metallic internal lining ASME VIII Div 1 002 NOTE: 1. The maximum instrument air demand is 660 Sm3/hr. The Air Compressor Capacity includes an additional 15% margin which has been assumed for drier bed regeneration, giving a total air compressor capacity of 760 Sm3/hr. Supplier to confirm the regeneration air flow requirement. 002 PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 30 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 640 INERT GAS Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location INERT GAS Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 640-PK-2701 Nitrogen Generator Package 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0013 Note 1 90 Sm3/h 5 12 9 -5 / 85 50 1.0 Vendor specified HOLD 4 002 640-RCV-2702 Nitrogen Receiver 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0013 Vertical Process Vessel 38 m3 12 7 -5 / 85 50 2.5 x 7.0 (ID x TT) 11.0 Shell: CS + 3mm CA with 316L SS internals ASME VIII DIV I 002 640-PK-2703 High Purity Nitrogen Bottles Skid 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0013 20 Sm3/h Vendor Specified HOLD 4 NOTE: 1. Nitrogen Generation Package typically includes: - Inlet Carbon Filters (2x100%) - Inlet Heater (1x100%) - Membrane Separators (with 20% spare membranes) 002 002 PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 31 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 660 SEWAGE TREATMENT Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location SEWAGE TREATMENT Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg(each) Temperature. °C Size L x W x H m Weight tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 660-PK-3201 A/B/C/D Sewage Sump Package 4 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0016 Septic Tank 5.0 m3 Vendor Specified Vendor Specified -5 / 85 50 1.0 Vendor Specified HOLD 3 - quantity, capacity 002 NOTE: 1. Equipment Tag 660-PK-3202 (Waste Water Treatment Package) has been deleted in Rev 002 of this document. 002 PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 32 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 710 FIRE WATER Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location FIRE WATER Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 710-TK-2301 Firewater Storage Tank 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0007 Note 1 2836 m3 ATM ATM -5 / 85 50 18 ID x 14.4 H 120 CS + 3mm CA with non-metallic internal lining API 650 002 710-P-2302 Electric Firewater Pump 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0007 350 m3/h ® 10 bar dp 130 150 16 10.0 -5 / 85 50 6 Case: Ni Al Bz Impeller: Ni Al Bz NFPA 20 3 x 50% Firewater pump configuration 002 710-PK-2303A/B Diesel Firewater Pump Package 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0007 Note 4 350 m3/h ® 10 bar dp 130 150 16 10.0 -5 / 85 50 15.0 Vendor Specified NFPA 20 3 x 50% Firewater pump configuration 002 710-P-2305A/B Fire Water Jockey Pump 2 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0007 10 m3/h ® 10 bar dp 8.0 11 16 10.0 -5 / 85 50 2.0 Case: Ni Al Bz Impeller: Ni Al Bz NFPA 20 2 x 100% electric pumps 002 710-A-2306 Foam Package (Condensate Storage Area) 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0007 Note 2 21 m3/h ® 11 bar dp 11 15 16 11.0 -5 / 85 50 2.0 CS + 3mm CA with non-metallic internal lining NFPA 20 API 650 HOLD 4 710-A-2307 Foam Package (Methanol Storage Area) 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0007 Note 3 CS + 3mm CA with non-metallic internal lining NFPA 20 API 650 HOLD 4 710-A-2310 Deluge Skid (Methanol Tank) (460-TK-2902) 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0007 NFPA 15 HOLD 4 710-A-2311 Deluge Skid (Condensate Tank) (330-TK-1501) 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0007 NFPA 15 HOLD 4 710-A-2312 Deluge Skid (Condensate Tank) (330-TK-1502) 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR-UFD-0007 NFPA 15 HOLD 4 710-A-2313 Deluge Skid (Offspec Condensate Tank) (330-TK-1503) 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0007 NFPA 15 HOLD 4 NOTE: • Fire Water Unit designed to cater for only the Condensate Storage Tanks. Accordingly, there will be no ring main and jockey pumps • Foam Package (Condensate Storage Area) contains Foam Pump and Foam Storage Tank (20m3). • Foam Package (Methanol Storage Area) contains Foam Storage Tank (1.35 m3). • Diesel Firewater Pump Package also contain diesel tank storage of 1 m3. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 33 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 800 MAIN POWER GENERATION Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location MAIN POWER GENERATION Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 800-GT-2001 Gas Turbine Generator 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0010 Note 1 4.0 MW 12 x 5.8 x 8.1 60 Vendor Standard API STD 616 Typically 6.75 MW ISO rated gas turbine (SGT-200) 800-GT-2002 Gas Turbine Generator 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0010 Note 1 4.0 MW 60 Vendor Standard API STD 616 Typically 6.75 MW ISO rated gas turbine (SGT-200) NOTE: • 2 x 100% duty Gas Turbine Generator Packages, each for 4 MW power output. • Overall package dimensions for 2 machines. GTG skid alone is significantly smaller. PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 34 of 35 EQUIPMENT LIST DETAILS SYSTEM CODE: 830 EMERGENCY POWER GENERATORS Project PROJECT1 DEVELOPMENT PROJECT Originated By LY Client COMPANY Checked By JL Location EMERGENCY POWER GENERATORS Approved By CF Job No. PROJECT NUMBER Revision 002 Doc No. Project1-FEED CONTRACTOR--MUL-E000-PR-LST-0001 Date DATE Tag Number Equipment Name QTY PFD No. Package Notes Capacity Duty kW Instal. Power kW Surface Area (m2) Pressure barg Temperature. °C Size L x W x H m Weight (each) tonnes Materials Design Code Internals Insulation Remarks Rev Flag Design Oper Design Oper 830-GD-2001 Emergency / Standby Diesel Generator 1 PROJECT1-FEED CONTRACTOR-PF01-E000-PR- UFD-0010 750 7.5 x 4.0 x4.0 30 CS (Vendor Standard) IEC-60034 NOTE: PROJECT1-FEED CONTRACTOR-MUL-E000-PR-LST-0001_Rev002 - Page 35 of 35